Mesa CSG 1 Murdock
2169 River Road, Grand Junction, CO 81526Plant Summary Information
Mesa CSG 1 Murdock is ranked #74 out of 159 solar farms in Colorado in terms of total annual net electricity generation.
Mesa CSG 1 Murdock generated 664.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Mesa CSG 1 Murdock |
|---|---|
| Utility Name | Standard Solar |
| Location | Mesa County, CO |
| Initial Operation Date | May 2019 |
| Last Update | Dec 2024 |
| Annual Generation | 3.8 GWh |
| Annual Consumption | 13.4 k MMBtu |
| Ranked #8,752 out of 12,539 Power Plants Nationwide | |
| Ranked #3,750 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #187 out of 282 Colorado Power Plants | |
| Ranked #74 out of 159 Colorado Solar Power Plants | |
| Fuel Types | Solar |
Map of Mesa CSG 1 Murdock
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mesa CSG 1 Murdock.
Monthly Net Generation for Mesa CSG 1 Murdock
Mesa CSG 1 Murdock Details
| Summary Information | |
|---|---|
| Plant Name | Mesa CSG 1 Murdock (62719) |
| Plant Address | 2169 River Road, Grand Junction, CO 81526 |
| Utility | Standard Solar (60531) |
| Latitude, Longitude | 39.10879, -108.64387 |
| Generation Dates on File | May 2019 to Dec 2024 |
| Initial Operation Date | May 2019 |
| Annual Generation | 3.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Public Service Company of Colorado (PSCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Public Service Co of Colorado (15466) CO |
| Grid Voltage | 13.20 kV |
| Energy Storage | No |
Generator X0038 Details Operating May 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | Yes |
| Virtual Net Metering DC Capacity | 2 MW |
Mesa CSG 1 Murdock Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3740 | 315 Vinson Road | Clayton, NC | 3.8 GWh |
| #3741 | Cosper Creek Solar (CSG) | Willamina, OR | 3.8 GWh |
| #3742 | Kankakee Solar 4 LLC | Kankakee, IL | 3.8 GWh |
| #3743 | Pittman Solar One LLC | Hancock, MD | 3.8 GWh |
| #3744 | Crawfordsville Solar Park 4 | Crawfordsville, IN | 3.8 GWh |
| #3745 | Illinois PV Fulton 1 CSG | Farmington, IL | 3.8 GWh |
| #3746 | Reedley Community College Solar | Reedley, CA | 3.8 GWh |
| #3747 | NSE Camber Solar PS6 LLC CSG | Platteville, CO | 3.8 GWh |
| #3748 | Gainey Solar, LLC | Clarkton, NC | 3.8 GWh |
| #3749 | 433 Purchase Solar NG, LLC | Swansea, MA | 3.8 GWh |
| #3751 | Northampton Landfill Solar PV | Northampton, MA | 3.8 GWh |
| #3752 | Vulcan San Emidio Solar | Bakersfield, CA | 3.8 GWh |
| #3753 | Kenansville | Kenansville, NC | 3.8 GWh |
| #3754 | P52ES 1755 Henryton Rd Phase 2 LLC | Marriottsville, MD | 3.8 GWh |
| #3755 | McDonough Solar 1, LLC CSG | Blandinsville, IL | 3.8 GWh |
| #3756 | Ajax Solar | Shannon, NC | 3.8 GWh |
| #3757 | Sterling PV 3 | Sterling, CO | 3.8 GWh |
| #3758 | Samoset Solar | Rockport, ME | 3.8 GWh |
| #3759 | SulusSolar29 | Boring, OR | 3.8 GWh |
| #3760 | Kimberly-Clark Solar | LaGrange, GA | 3.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mesa CSG 1 Murdock.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ash Mesa Solar, LLC | Olathe, CO | 16.4 GWh | 46.5 mi |
| Bar D | Meeker, CO | 5.6 GWh | 57.1 mi |
| Eagle Springs Solar LLC | Silt, CO | 1.5 GWh | 58.3 mi |
| Fruita | Grand Junction, CO | 975.0 MWh | 5.2 mi |
| Garnet Mesa Solar | Delta, CO | 40.2 GWh | 43.7 mi |
| Lower Molina | Molina, CO | 12.1 GWh | 32.7 mi |
| Mesa CSG 2 Massicotte | Palisade, CO | 3.3 GWh | 12.8 mi |
| Mesa PV1 | Grand Junction, CO | 3.4 GWh | 7.8 mi |
| Oak Leaf Solar XXXI LLC (CSG) | Debeque, CO | 3.4 GWh | 17.5 mi |
| Oak Leaf Solar XXXII (CSG) | Rifle, CO | 2.8 GWh | 52.7 mi |
| Pivot Solar 1 LLC (CSG) | Parachute, CO | 1.9 GWh | 36.4 mi |
| Pivot Solar 3 LLC (CSG) | Parachute, CO | 3.6 GWh | 36.4 mi |
| Pivot Solar 7 LLC (CSG) | Rifle, CO | 3.6 GWh | 52.7 mi |
| Redlands Water & Power | Grand Junction, CO | 7.3 GWh | 4 mi |
| Shavano Falls Hydro | Montrose, CO | 12.0 GWh | 54.9 mi |
| SMPA Solar 1 Community Solar | Bedrock, CO | 1.7 GWh | 58.3 mi |
| Upper Molina | Molina, CO | 23.8 GWh | 34.3 mi |
| USS Fruita Solar LLC CSG | Fruita, CO | 2.9 GWh | 11.9 mi |
| Vinelands Power Plant | Palisade, CO | 15.6 GWh | 16 mi |
| WWRF Solar Plant | Rifle, CO | 1.7 GWh | 52.8 mi |