Laredo Detention Facility - Solar 2, 3

17695 Industrial Farm Rd, Bakersfield, CA 93308

Plant Summary Information

Laredo Detention Facility - Solar 2, 3 is ranked #427 out of 849 solar farms in California in terms of total annual net electricity generation.

Laredo Detention Facility - Solar 2, 3 generated 975.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameLaredo Detention Facility - Solar 2, 3
Utility NameCounty of Kern
LocationKern County, CA
Initial Operation DateNovember 2021
Last Update Dec 2024
Annual Generation 5.1 GWh
Annual Consumption 18.9 k MMBtu
Ranked #7,985 out of 12,539 Power Plants Nationwide
Ranked #3,162 out of 6,400 Solar Power Plants Nationwide
Ranked #1,087 out of 1,600 California Power Plants
Ranked #427 out of 849 California Solar Power Plants
Fuel Types Solar

Map of Laredo Detention Facility - Solar 2, 3

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Laredo Detention Facility - Solar 2, 3.

Create Your Account Today

Monthly Net Generation for Laredo Detention Facility - Solar 2, 3

Laredo Detention Facility - Solar 2, 3 Details

Summary Information
Plant NameLaredo Detention Facility - Solar 2, 3 (65464)
Plant Address17695 Industrial Farm Rd, Bakersfield, CA 93308
UtilityCounty of Kern (64731)
Latitude, Longitude35.51094, -119.10994
Generation Dates on FileNov 2021 to Dec 2024
Initial Operation DateNovember 2021
Annual Generation 5.1 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator LDF2 Details Operating November 2021

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity3.1 MW
Summer Capacity3 MW
Winter Capacity2.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2021
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle10
DC Net Capacity3.4 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity2.4 MW
Virtual Net Metering AgreementNo

Generator LDF3 Details Operating November 2021

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity2.1 MW
Summer Capacity2.1 MW
Winter Capacity1.7 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2021
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle10
DC Net Capacity3.3 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity3.3 MW
Virtual Net Metering AgreementNo

Laredo Detention Facility - Solar 2, 3 Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3152Green Beanworks C PVPalmdale, CA5.1 GWh
#3153Westmont 300BSan Pedro, CA5.1 GWh
#3154Arctaris Saddleback SolarDallas Plantation, ME5.1 GWh
#3155Raboth - Marion DriveKingston, MA5.1 GWh
#3156Forest City SolarForest City, IA5.1 GWh
#3157Davidson IVLexington, NC5.1 GWh
#3158Barnhill Road Solar, LLCElizabeth City, NC5.1 GWh
#3159HintonHinton, OK5.1 GWh
#3160Red Maple SolarCleveland, MN5.1 GWh
#3161Broadway Solar (CSG)Bangor, ME5.1 GWh
#3163Quittacas Pond SolarRochester, MA5.1 GWh
#3164Dept of General Services -FTBSacramento, CA5.1 GWh
#3165Green MeadowsSandwich, MA5.1 GWh
#31663104 Batavia SolarBatavia, NY5.1 GWh
#3167Onyx - Brockton Thatcher Landfill SolarBrockton, MA5.1 GWh
#3168Noland Wastewater Treatment Plant HybridFayetteville, AR4.7 GWh
#3169Town of Rocky Hill PV CSGRocky Hill, CT5.1 GWh
#3170Lenape IIIndianapolis, IN5.1 GWh
#3171TES RowtierWestminster, MA5.1 GWh
#31723ColtonMillbury, MA5.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Laredo Detention Facility - Solar 2, 3.

Plant NamePlant LocationAnnual GenerationDistance
Amazon Bakersfield 1 Solar ProjectBakersfiled, CA7.9 GWh5.5 mi
Badger Creek LimitedBakersfield, CA6.2 GWh4.9 mi
Broadway 4 - Target ShafterShafter, CA3.0 GWh5.5 mi
Calibrant Bakersfield LLCBakersfield, CA3.9 GWh4.8 mi
Double C Generation Limited PartnershipBakersfield, CA14.9 GWh3.7 mi
E&B ResourcesBakersfield, CA2.2 GWh3.2 mi
Frontier HS Solar ProjectBakersfield, CA2.5 GWh6.8 mi
High Sierra LimitedBakersfield, CA14.1 GWh4.5 mi
Improvement Dst No. 4Bakersfield, CA12.0 MWh8.5 mi
Kern Front LimitedBakersfield, CA12.2 GWh3.9 mi
Kern River CogenerationBakersfield, CA154.9 GWh8.1 mi
Kern River Eastridge CogenBakersfield, CA221.6 GWh9.7 mi
Live Oak LimitedBakersfield, CA21.1 GWh4.9 mi
Mt Poso CogenerationBakersfield, CA179.7 GWh7.4 mi
North Kern 1Shafter, CA3.9 GWh4.4 mi
North Kern 2City of Shafter, CA2.4 GWh3.9 mi
North Kern 3Bakersfield, CA6.0 MWh5.2 mi
Shafter Solar LLCBakersfield, CA46.3 GWh8.2 mi
Sycamore CogenerationBakersfield, CA304.3 GWh8.1 mi
Western Power & Steam IncBakersfield, CA25.2 GWh7.3 mi