Laredo Detention Facility - Solar 2, 3
17695 Industrial Farm Rd, Bakersfield, CA 93308Plant Summary Information
Laredo Detention Facility - Solar 2, 3 is ranked #427 out of 849 solar farms in California in terms of total annual net electricity generation.
Laredo Detention Facility - Solar 2, 3 generated 975.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Laredo Detention Facility - Solar 2, 3 |
|---|---|
| Utility Name | County of Kern |
| Location | Kern County, CA |
| Initial Operation Date | November 2021 |
| Last Update | Dec 2024 |
| Annual Generation | 5.1 GWh |
| Annual Consumption | 18.9 k MMBtu |
| Ranked #7,985 out of 12,539 Power Plants Nationwide | |
| Ranked #3,162 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,087 out of 1,600 California Power Plants | |
| Ranked #427 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Laredo Detention Facility - Solar 2, 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Laredo Detention Facility - Solar 2, 3.
Monthly Net Generation for Laredo Detention Facility - Solar 2, 3
Laredo Detention Facility - Solar 2, 3 Details
| Summary Information | |
|---|---|
| Plant Name | Laredo Detention Facility - Solar 2, 3 (65464) |
| Plant Address | 17695 Industrial Farm Rd, Bakersfield, CA 93308 |
| Utility | County of Kern (64731) |
| Latitude, Longitude | 35.51094, -119.10994 |
| Generation Dates on File | Nov 2021 to Dec 2024 |
| Initial Operation Date | November 2021 |
| Annual Generation | 5.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator LDF2 Details Operating November 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 3.1 MW |
| Summer Capacity | 3 MW |
| Winter Capacity | 2.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2021 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 3.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 2.4 MW |
| Virtual Net Metering Agreement | No |
Generator LDF3 Details Operating November 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2.1 MW |
| Summer Capacity | 2.1 MW |
| Winter Capacity | 1.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2021 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 3.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 3.3 MW |
| Virtual Net Metering Agreement | No |
Laredo Detention Facility - Solar 2, 3 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3152 | Green Beanworks C PV | Palmdale, CA | 5.1 GWh |
| #3153 | Westmont 300B | San Pedro, CA | 5.1 GWh |
| #3154 | Arctaris Saddleback Solar | Dallas Plantation, ME | 5.1 GWh |
| #3155 | Raboth - Marion Drive | Kingston, MA | 5.1 GWh |
| #3156 | Forest City Solar | Forest City, IA | 5.1 GWh |
| #3157 | Davidson IV | Lexington, NC | 5.1 GWh |
| #3158 | Barnhill Road Solar, LLC | Elizabeth City, NC | 5.1 GWh |
| #3159 | Hinton | Hinton, OK | 5.1 GWh |
| #3160 | Red Maple Solar | Cleveland, MN | 5.1 GWh |
| #3161 | Broadway Solar (CSG) | Bangor, ME | 5.1 GWh |
| #3163 | Quittacas Pond Solar | Rochester, MA | 5.1 GWh |
| #3164 | Dept of General Services -FTB | Sacramento, CA | 5.1 GWh |
| #3165 | Green Meadows | Sandwich, MA | 5.1 GWh |
| #3166 | 3104 Batavia Solar | Batavia, NY | 5.1 GWh |
| #3167 | Onyx - Brockton Thatcher Landfill Solar | Brockton, MA | 5.1 GWh |
| #3168 | Noland Wastewater Treatment Plant Hybrid | Fayetteville, AR | 4.7 GWh |
| #3169 | Town of Rocky Hill PV CSG | Rocky Hill, CT | 5.1 GWh |
| #3170 | Lenape II | Indianapolis, IN | 5.1 GWh |
| #3171 | TES Rowtier | Westminster, MA | 5.1 GWh |
| #3172 | 3Colton | Millbury, MA | 5.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Laredo Detention Facility - Solar 2, 3.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amazon Bakersfield 1 Solar Project | Bakersfiled, CA | 7.9 GWh | 5.5 mi |
| Badger Creek Limited | Bakersfield, CA | 6.2 GWh | 4.9 mi |
| Broadway 4 - Target Shafter | Shafter, CA | 3.0 GWh | 5.5 mi |
| Calibrant Bakersfield LLC | Bakersfield, CA | 3.9 GWh | 4.8 mi |
| Double C Generation Limited Partnership | Bakersfield, CA | 14.9 GWh | 3.7 mi |
| E&B Resources | Bakersfield, CA | 2.2 GWh | 3.2 mi |
| Frontier HS Solar Project | Bakersfield, CA | 2.5 GWh | 6.8 mi |
| High Sierra Limited | Bakersfield, CA | 14.1 GWh | 4.5 mi |
| Improvement Dst No. 4 | Bakersfield, CA | 12.0 MWh | 8.5 mi |
| Kern Front Limited | Bakersfield, CA | 12.2 GWh | 3.9 mi |
| Kern River Cogeneration | Bakersfield, CA | 154.9 GWh | 8.1 mi |
| Kern River Eastridge Cogen | Bakersfield, CA | 221.6 GWh | 9.7 mi |
| Live Oak Limited | Bakersfield, CA | 21.1 GWh | 4.9 mi |
| Mt Poso Cogeneration | Bakersfield, CA | 179.7 GWh | 7.4 mi |
| North Kern 1 | Shafter, CA | 3.9 GWh | 4.4 mi |
| North Kern 2 | City of Shafter, CA | 2.4 GWh | 3.9 mi |
| North Kern 3 | Bakersfield, CA | 6.0 MWh | 5.2 mi |
| Shafter Solar LLC | Bakersfield, CA | 46.3 GWh | 8.2 mi |
| Sycamore Cogeneration | Bakersfield, CA | 304.3 GWh | 8.1 mi |
| Western Power & Steam Inc | Bakersfield, CA | 25.2 GWh | 7.3 mi |