Buzzard Flop
4894 N 381 Rd, Calvin, OK 74531Plant Summary Information
Buzzard Flop is ranked #30 out of 35 natural gas power plants in Oklahoma in terms of total annual net electricity generation.
Buzzard Flop is comprised of 3 generators and generated 5.4 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Buzzard Flop |
---|---|
Utility Name | Peoples Electric Cooperative |
Location | Hughes County, OK |
Initial Operation Date | April 2023 |
Last Update | Dec 2024 |
Annual Generation | 24.9 GWh |
Annual Consumption | 260.1 k MMBtu |
Ranked #4,907 out of 12,299 Power Plants Nationwide | |
Ranked #1,311 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #110 out of 132 Oklahoma Power Plants | |
Ranked #30 out of 35 Oklahoma Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Buzzard Flop
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Buzzard Flop.
Monthly Net Generation for Buzzard Flop
Buzzard Flop Details
Summary Information | |
---|---|
Plant Name | Buzzard Flop (68375) |
Plant Address | 4894 N 381 Rd, Calvin, OK 74531 |
Utility | Peoples Electric Cooperative (66748) |
Latitude, Longitude | 34.8553, -96.22909 |
Generation Dates on File | Jan 2024 to Dec 2024 |
Initial Operation Date | April 2023 |
Annual Generation | 24.9 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Southwestern Power Administration (17716) OK |
Grid Voltage | 138.00 kV / 24.94 kV / 13.20 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | MARKWEST PIONEER LLC |
Natural Gas Storage | No |
Generator 169 Details Operating April 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WR.PEOP.BUZZARDFLOP |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Allen WR |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.29 MW |
Winter Capacity | 2.01 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 170 Details Operating April 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WR.PEOP.BUZZARDFLOP |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Allen WR |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.26 MW |
Winter Capacity | 2.03 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 171 Details Operating April 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WR.PEOP.BUZZARDFLOP |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Allen WR |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.18 MW |
Winter Capacity | 2.03 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Buzzard Flop Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1301 | Fairfield University CHP Plant | Fairfield, CT | 26.1 GWh |
#1302 | Kettle Falls Generating Station | Kettle Falls, WA | 335.1 GWh |
#1303 | CIP II/AR Bridgewater Holdings - NJCOE | Bridgewater, NJ | 25.9 GWh |
#1304 | Central Michigan University | Mt. Pleasant, MI | 25.6 GWh |
#1305 | Tenaska Georgia Generation Facility | Franklin, GA | 30.8 GWh |
#1306 | Grossmont Hospital | La Mesa, CA | 25.5 GWh |
#1307 | Georgia-Pacific Toledo Mill | Toledo, OR | 56.2 GWh |
#1308 | Caterpillar | Lafayette, IN | 25.4 GWh |
#1309 | OBP Cogen | New York, NY | 25.4 GWh |
#1310 | Elk Mound | Elk Mound, WI | 25.2 GWh |
#1312 | University of Rochester | Rochester, NY | 24.7 GWh |
#1313 | Indigo Energy Facility | North Palm Springs, CA | 24.6 GWh |
#1314 | Princeton Energy Center, LLC | Plainsboro, NJ | 24.6 GWh |
#1315 | Chanute 2 | Chanute, KS | 24.6 GWh |
#1316 | Larkspur Energy Facility | San Diego, CA | 24.4 GWh |
#1317 | SRI International Cogen Project | Menlo Park, CA | 24.1 GWh |
#1318 | New Haven Harbor | New Haven, CT | 45.2 GWh |
#1319 | Village Creek Water Reclamation Facility | Arlington, TX | 24.0 GWh |
#1320 | Frito Lay Incorporated | Dayville, CT | 24.0 GWh |
#1321 | Shakopee Energy Park | Shakopee, MN | 24.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Buzzard Flop.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arbuckle Mountain Wind Farm LLC | Davis, OK | 355.9 GWh | 60.9 mi |
Butterfield Solar Farm | Durant, OK | 10.6 GWh | 62.4 mi |
Centrahoma East | Centrahoma, OK | 87.0 GWh | 18.7 mi |
Centrahoma West | Centrahoma, OK | 93.1 GWh | 18.5 mi |
Chickasaw Nation Solar Farm | Davis, OK | 10.5 GWh | 56.2 mi |
Choctaw Nation Solar Farm | Calera, OK | 9.3 GWh | 62.4 mi |
Denison | Denison, TX | 191.9 GWh | 74.2 mi |
Diamond Spring, LLC | Sulphur, OK | 715.3 GWh | 40.3 mi |
Eufaula Dam | Porum, OK | 219.6 GWh | 58.3 mi |
Glass Sands Wind Facility | Sulphur, OK | 412.1 GWh | 45.6 mi |
Horseshoe Lake | Harrah, OK | 865.2 GWh | 70.1 mi |
Kiamichi Energy Facility | Kiowa, OK | 5.4 TWh | 20.5 mi |
Norman Solar | Norman, OK | 4.5 GWh | 69 mi |
Origin Wind | Hennepin, OK | 514.3 GWh | 65.6 mi |
People's | Fitzhugh, OK | 12.8 GWh | 32.9 mi |
Rockhaven Wind Project, LLC | Hennepin, OK | 474.9 GWh | 67.2 mi |
Seminole | Konowa, OK | 2.3 TWh | 29.2 mi |
Tinker | Oklahoma City, OK | 30.7 GWh | 75.3 mi |
Weleetka | Weleetka, OK | 4.3 GWh | 32.8 mi |
Wildhorse Mountain Wind Facility | Clayton, OK | 395.7 GWh | 61.7 mi |