Frederick Battery Storage
3833 Tipple Parkway,, Frederick, CO 80516Plant Summary Information
Frederick Battery Storage is ranked #31 out of 41 electricity used for energy storage power plants nationwide in terms of total annual net electricity generation.
Frederick Battery Storage is comprised of 1 generator and generated 311.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Frederick Battery Storage |
---|---|
Utility Name | United Power, Inc |
Location | Weld County, CO |
Initial Operation Date | September 2024 |
Last Update | Dec 2024 |
Annual Generation | 311.0 MWh |
Annual Consumption | 0 MMBtu |
Ranked #11,569 out of 12,299 Power Plants Nationwide | |
Ranked #31 out of 41 Electricity Used For Energy Storage Power Plants Nationwide | |
Ranked #279 out of 283 Colorado Power Plants | |
Ranked #8 out of 8 Colorado Electricity Used For Energy Storage Power Plants | |
Fuel Types | Electricity used for energy storage |
Map of Frederick Battery Storage
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Frederick Battery Storage.
Monthly Net Generation for Frederick Battery Storage
Frederick Battery Storage Details
Summary Information | |
---|---|
Plant Name | Frederick Battery Storage (67302) |
Plant Address | 3833 Tipple Parkway,, Frederick, CO 80516 |
Utility | United Power, Inc (19499) |
Latitude, Longitude | 40.10462, -104.98452 |
Generation Dates on File | Oct 2024 to Dec 2024 |
Initial Operation Date | September 2024 |
Annual Generation | 311.0 MWh |
Fuel Types | Electricity used for energy storage |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | United Power, Inc (19499) CO |
Grid Voltage | 13.20 kV |
Energy Storage | Yes |
Generator FREBA Details Operating September 2024
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 7.8 MW |
Summer Capacity | 7.8 MW |
Winter Capacity | 7.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2024 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 31.3 |
---|---|
Maximum Charge Rate | 7.8 MW |
Maximum Discharge Rate | 7.8 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 3.1 |
Storage Enclosure Type | CS |
Arbitrage | P |
Ramping Spinning Reserve | Yes |
Transmission And Distribution Deferral | Yes |
System Peak Shaving | Yes |
Ac Coupled | No |
Independent | No |
Direct Support Of Another Unit | No |
Support T D Asset | Yes |
Frederick Battery Storage Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Ameresco | 1820 Midpark RoadSuite C, Knoxville, TN 37921 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Electricity used for energy storage.
Nearby Power Plants
Below are closest 20 power plants surrounding Frederick Battery Storage.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brighton PV Solar Plant | Brighton, CO | 3.3 GWh | 8.7 mi |
City of Boulder WWTP | Boulder, CO | 1.2 GWh | 11.1 mi |
Davis Battery Storage | Fort Lupton, CO | 672.0 MWh | 12.9 mi |
Fort Lupton | Ft. Lupton, CO | 12.4 GWh | 10 mi |
Fort St Vrain | Platteville, CO | 3.8 TWh | 11.4 mi |
Front Range Project | Erie, CO | 18.6 GWh | 5.3 mi |
Jack's Solar Garden | Longmont, CO | 2.2 GWh | 7.8 mi |
JM Shafer Generating Station | Ft. Lupton, CO | 835.3 GWh | 11.2 mi |
Lafayette Horizon Solar CSG LLC | Lafayette, CO | 3.6 GWh | 9.5 mi |
Mead Battery Storage | Longmont, CO | 691.0 MWh | 8.2 mi |
NSE Camber Solar PS5 LLC (CSG) | Platteville, CO | 3.6 GWh | 12.6 mi |
Parkway Battery Storage | Broomfield, CO | 719.0 MWh | 8.3 mi |
Platte Valley Battery Storage | Longmont, CO | 507.0 MWh | 10.9 mi |
Spindle Hill Energy Center | Fort Lupton, CO | 526.1 GWh | 5.2 mi |
SR Jenkins Ft Lupton | Ft. Lupton, CO | 30.9 GWh | 12.7 mi |
SR Mavericks | Mead, CO | 15.3 GWh | 9 mi |
Valmont | Boulder, CO | 19.7 GWh | 12.9 mi |
Valmont Combustion Turbine Project | Boulder, CO | 46.0 GWh | 12.8 mi |
Vasquez V CSG | Platteville, CO | 8.2 GWh | 13.2 mi |
Weld 1 Community Solar Array | Platteville, CO | 3.4 GWh | 13.5 mi |