8505 South Texas Road, Anacortes, WA 98221Plant Summary Information
HF Sinclair Puget Sound Refining is ranked #22 out of 132 power plants in Washington in terms of total annual net electricity generation.
HF Sinclair Puget Sound Refining is comprised of 3 generators and generated 222.4 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | HF Sinclair Puget Sound Refining |
|---|---|
| Utility Name | HF Sinclair Corporation |
| Location | Skagit County, WA |
| Initial Operation Date | September 1991 |
| Last Update | Jun 2026 |
| Annual Generation | 896.5 GWh |
| Annual Consumption | 11.8 M MMBtu |
| Ranked #810 out of 13,094 Power Plants Nationwide | |
| Ranked #504 out of 2,208 Natural Gas Power Plants Nationwide | |
| Ranked #22 out of 132 Washington Power Plants | |
| Ranked #8 out of 20 Washington Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 74.5% Other Gas : 25.5% |
| Previous Operators |
March Point Cogeneration Co (2013 to 2020) HollyFrontier Corporation (2021 to 2021) HF Sinclair Corporation (2022 to 2025) |
Map of HF Sinclair Puget Sound Refining
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for HF Sinclair Puget Sound Refining.
Monthly Net Generation for HF Sinclair Puget Sound Refining
Monthly Plant Fuel Consumption for HF Sinclair Puget Sound Refining
HF Sinclair Puget Sound Refining Details
| Summary Information | |
|---|---|
| Plant Name | HF Sinclair Puget Sound Refining (54268) |
| Plant Address | 8505 South Texas Road, Anacortes, WA 98221 |
| Utility | HF Sinclair Corporation (64469) |
| Latitude, Longitude | 48.4708, -122.56 |
| Generation Dates on File | Jan 2001 to Jun 2026 |
| Initial Operation Date | September 1991 |
| Annual Generation | 896.5 GWh |
| Fuel Types | Natural Gas : 74.5% Other Gas : 25.5% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 91-221-000 |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Puget Sound Energy (PSEI) |
| NAICS Code | Petroleum Refineries (32411) |
| Sector | Industrial CHP (7) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Puget Sound Energy Inc (15500) WA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | CASCADE NAT GAS CORP |
| Natural Gas Storage | No |
Generator GTG2 Details Operating October 1991
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Nameplate Capacity | 46.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 40 MW |
| Winter Capacity | 46 MW |
| Minimum Load | 35 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 1991 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Other Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GTG1 Details Operating September 1991
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Nameplate Capacity | 46.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 40 MW |
| Winter Capacity | 46 MW |
| Minimum Load | 35 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 1991 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Other Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GTG3 Details Operating January 1993
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Nameplate Capacity | 46.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 40 MW |
| Winter Capacity | 46 MW |
| Minimum Load | 35 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 1993 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Other Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
HF Sinclair Puget Sound Refining Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #494 | Gleason Generating Facility | Gleason, TN | 719.9 GWh |
| #495 | Dean | East China, MI | 704.8 GWh |
| #496 | Orlando Cogen LP | Orlando, FL | 704.8 GWh |
| #497 | New Castle Plant | West Pittsburg, PA | 695.4 GWh |
| #498 | Las Vegas Generating Station | North Las Vegas, NV | 695.1 GWh |
| #499 | A B Brown | Mount Vernon, IN | 686.6 GWh |
| #500 | Gregory Power Plant | Gregory, TX | 681.9 GWh |
| #501 | John R Kelly | Gainesville, FL | 680.1 GWh |
| #502 | Sumas Power Plant | Sumas, WA | 675.8 GWh |
| #503 | Riverside (OK) | Jenks, OK | 668.0 GWh |
| #505 | JM Shafer Generating Station | Ft. Lupton, CO | 667.2 GWh |
| #506 | Permian Basin | Monahans, TX | 669.5 GWh |
| #507 | Tracy Combined Cycle Power Plant | Tracy, CA | 655.2 GWh |
| #508 | Tennessee Eastman Operations | Kingsport, TN | 1.0 TWh |
| #509 | Greenland Energy Center | Jacksonville, FL | 658.1 GWh |
| #510 | Panoche Energy Center | Firebaugh, CA | 649.6 GWh |
| #511 | Marsh Run Generation Facility | Remington, VA | 687.4 GWh |
| #512 | Cherokee County Cogen | Gaffney, SC | 644.3 GWh |
| #513 | Martinez Refining | Martinez, CA | 665.5 GWh |
| #514 | North Valmy | Valmy, NV | 1.4 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding HF Sinclair Puget Sound Refining.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arlington Microgrid | Arlington, WA | 601.0 MWh | 28.8 mi |
| Darrington | Darrington, WA | 12.3 GWh | 46.2 mi |
| Encogen | Bellingham, WA | 195.7 GWh | 19.3 mi |
| Ferndale Generating Station | Ferndale, WA | 584.8 GWh | 25.4 mi |
| Fredonia (WA) | Mt Vernon, WA | 57.9 GWh | 5.8 mi |
| Gorge | Rockport, WA | 938.6 GWh | 63.7 mi |
| H M Jackson | Sultan, WA | 333.6 GWh | 51.9 mi |
| Koma Kulshan | Concrete, WA | 32.3 GWh | 40.9 mi |
| Lower Baker | Concrete, WA | 364.8 GWh | 37.9 mi |
| Nooksack Hydro | Glacier, WA | 20.2 GWh | 45.5 mi |
| Port Townsend Paper | Port Townsend, WA | 7.7 GWh | 28.3 mi |
| Rocky Brook Hydroelectric | Brinnon, WA | 464.0 MWh | 54.8 mi |
| Sierra Pacific Burlington Facility | Mt Vernon, WA | 160.2 GWh | 6 mi |
| South Fork Tolt | North Bend, WA | 48.6 GWh | 64.2 mi |
| Sumas Power Plant | Sumas, WA | 675.8 GWh | 38.2 mi |
| University of Washington Power Plant | Seattle, WA | 127.4 MWh | 57.7 mi |
| Upper Baker | Concrete, WA | 332.7 GWh | 41.6 mi |
| West Point Treatment Plant | Seattle, WA | 14.3 GWh | 56.2 mi |
| Whitehorn | Blaine, WA | 65.2 GWh | 30 mi |
| Youngs Creek Hydroelectric Project | Monroe, WA | 12.9 GWh | 58.6 mi |