Directory of Power Plants in New York
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| 1639 RT 29 Solar 1 | 1639 RT 29 Solar 1, LLC | Gloversville, NY | ISO New England (ISNE) | 7.5 GWh | Nov 2020 | Dec 2024 | Solar |
| 1639 RT 29 Solar 2 | 1639 RT 29 Solar 2, LLC | Gloversville, NY | ISO New England (ISNE) | 4.7 GWh | Nov 2020 | Dec 2024 | Solar |
| SDM000 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 13.6 GWh | Apr 2018 | Dec 2024 | Natural Gas |
| NHH003 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 8.8 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| NHH004 Winthrop Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| Tioga Solar North(CSG) | 237 State Route 96 Site 1, LLC | Owego, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Oct 2021 | Dec 2024 | Solar |
| Tioga Solar South(CSG) | 237 State Route 96 Site 2, LLC | Owego, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Oct 2021 | Dec 2024 | Solar |
| 3104 Batavia Solar | 3104 Batavia Solar, LLC | Batavia, NY | ISO New England (ISNE) | 5.1 GWh | Feb 2021 | Dec 2024 | Solar |
| 3232 Batavia Solar | 3232 Batavia Solar, LLC | Batavia, NY | ISO New England (ISNE) | 6.9 GWh | Feb 2021 | Dec 2024 | Solar |
| 6140 Route 209 - North | 6140 Route 209 - North, LLC | Kerhonkson, NY | New York Independent System Operator (NYIS) | 6.8 GWh | Sep 2019 | Dec 2024 | Solar |
| NY Lancaster Gunnville Rd Site 1 Solar C | AC Power 14, LLC | Lancaster, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Jan 2024 | Dec 2024 | Solar |
| NY Lancaster Shisler Rd Site 2 Solar CSG | AC Power 14, LLC | Lancaster, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Jan 2024 | Dec 2024 | Solar |
| Canandaigua Solar Array | AEP Onsite Partners, LLC | Canandaigua, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2016 | Dec 2024 | Solar |
| Madison County | AEP Onsite Partners, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Jul 2017 | Dec 2024 | Solar |
| Camden CSD Solar Array | AEP Onsite Partners, LLC | Camden, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Nov 2017 | Dec 2024 | Solar |
| Letchworth Solar Project | AEP Onsite Partners, LLC | Gainesville, NY | New York Independent System Operator (NYIS) | 1.8 GWh | May 2017 | Dec 2024 | Solar |
| Canandaigua Westbrook Solar Array | AEP Onsite Partners, LLC | Canandaigua, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Feb 2017 | Dec 2024 | Solar |
| Bloom-Altice Fuel Cell | AEP Onsite Partners, LLC | Bethpage,, NY | New York Independent System Operator (NYIS) | 15.6 GWh | Sep 2020 | Dec 2024 | Natural Gas |
| Garnet Solar (NY) | AEP Onsite Partners, LLC | Johnsburg, NY | New York Independent System Operator (NYIS) | 2.8 GWh | May 2018 | Dec 2024 | Solar |
| JB-Tobin 2 | AES Clean Energy | La Grange, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Nov 2021 | Dec 2024 | Solar |
| Princetown Solar 1 | AES Clean Energy | Duanesburg, NY | New York Independent System Operator (NYIS) | 221.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Northline Solar CSG | AES Clean Energy | Schaghticoke, NY | New York Independent System Operator (NYIS) | 936.0 MWh | Aug 2024 | Dec 2024 | Solar |
| Knapp East (CSG) | AES Distributed Energy | Akron, NY | ISO New England (ISNE) | 7.4 GWh | Nov 2021 | Dec 2024 | Solar |
| St. Lawrence University - Sutton | AES Distributed Energy | Watertown, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Jun 2018 | Dec 2024 | Solar |
| Dusenberry | AES Distributed Energy | Troy, NY | ISO New England (ISNE) | 8.2 GWh | Nov 2021 | Dec 2024 | Solar |
| Glenmere Lake | AES Distributed Energy | Goshen, NY | ISO New England (ISNE) | 3.6 GWh | May 2021 | Dec 2024 | Solar |
| Middletown Solar 1, LLC Hybrid CSG | AES Distributed Energy | Middletown, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2020 | Dec 2024 | Solar |
| Greenwich Solar 1, LLC CSG | AES Distributed Energy | Greenwich, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Nov 2020 | Nov 2024 | Solar |
| AES Tonawanda Solar LLC | AES Distributed Energy | Tonawanda, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Dec 2019 | Dec 2024 | Solar |
| Beals Medina Solar LLC CSG | AES Distributed Energy | Medina, NY | New York Independent System Operator (NYIS) | 4.8 GWh | Apr 2020 | Dec 2024 | Solar |
| Allis Medina Solar LLC CSG | AES Distributed Energy | Medina, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Jun 2020 | Dec 2024 | Solar |
| Johnstown Solar 1, LLC | AES Distributed Energy | Gloversville, NY | New York Independent System Operator (NYIS) | 5.3 GWh | Nov 2019 | Dec 2024 | Solar |
| Ransomville Solar 1, LLC | AES Distributed Energy | Ransomville, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Nov 2019 | Dec 2024 | Solar |
| RT 52 Walden Solar 1, LLC Hybrid | AES Distributed Energy | Montgomery, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Finchville Solar, LLC Hybrid CSG | AES Distributed Energy | Mt. Hope, NY | New York Independent System Operator (NYIS) | 5.9 GWh | Sep 2020 | Dec 2024 | Solar |
| 25 Ashdown Road Solar, LLC | AES Distributed Energy | Clifton Park, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Nov 2019 | Nov 2024 | Solar |
| City of Rochester Solar | AES Distributed Energy | Rochester, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2017 | Dec 2024 | Solar |
| Broadalbin-Perth Solar | AES Distributed Energy | Amsterdam, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Aug 2018 | Dec 2024 | Solar |
| Monroe County Sites C, D, & E | AES Distributed Energy | Hilton, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Mattas Farms | AES Distributed Energy | Amsterdam, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Oct 2018 | Dec 2024 | Solar |
| Sutter Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Sep 2015 | Dec 2024 | Solar |
| Sterlington Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Sep 2015 | Dec 2024 | Solar |
| Leavenworth Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 16.9 GWh | May 2016 | Dec 2024 | Solar |
| Clarkson Solar | AES Distributed Energy | Potsdam, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Oct 2014 | Dec 2024 | Solar |
| South Goshen Community Solar | AES Distributed Energy | Goshen, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Aug 2021 | Dec 2024 | Solar |
| Riverhead Solar Farm | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 32.9 GWh | Jun 2019 | Dec 2024 | Solar |
| Cedar Creek PV | AES Distributed Energy | Seaford, NY | New York Independent System Operator (NYIS) | 2.8 GWh | May 2017 | Dec 2024 | Solar |
| Lichtenthal | AES Distributed Energy | Batavia, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Jun 2018 | Dec 2024 | Solar |
| Call Farms 1 | AES Distributed Energy | Batavia, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2018 | Dec 2024 | Solar |
| Call Farms 3 | AES Distributed Energy | Batavia, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2018 | Dec 2024 | Solar |
| Monroe County Sites A & B | AES Distributed Energy | Webster, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2017 | Dec 2024 | Solar |
| Main Rd Community Solar | AES Distributed Energy | Newstead, NY | ISO New England (ISNE) | 8.1 GWh | Jun 2022 | Dec 2024 | Solar |
| Anheuser-Busch Baldwinsville | AES Distributed Energy | Baldwinsville, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jun 2018 | Dec 2024 | Solar |
| Columbia University - Johnson Farms | AES Distributed Energy | Chester, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jun 2018 | Dec 2024 | Solar |
| Time Warner Cable Enterprises - Martino | AES Distributed Energy | Rome, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Jun 2018 | Dec 2024 | Solar |
| Columbia University - Minisink | AES Distributed Energy | Minisink, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Jun 2018 | Dec 2024 | Solar |
| Williams Rd | AES Distributed Energy | Ransomville, NY | ISO New England (ISNE) | 5.5 GWh | Aug 2021 | Dec 2024 | Solar |
| Townline Community Solar | AES Distributed Energy | Batavia, NY | ISO New England (ISNE) | 7.5 GWh | Jan 2022 | Dec 2024 | Solar |
| Redman South Community Solar | AES Distributed Energy | Brockport, NY | ISO New England (ISNE) | 9.7 GWh | Jan 2022 | Dec 2024 | Solar |
| Rowe (CSG) | AES Distributed Energy | Olean, NY | ISO New England (ISNE) | 7.6 GWh | Oct 2021 | Dec 2024 | Solar |
| Knapp West(CSG) | AES Distributed Energy | Akron, NY | ISO New England (ISNE) | 6.9 GWh | Nov 2021 | Dec 2024 | Solar |
| Redman North Community Solar | AES Distributed Energy | Brockport, NY | ISO New England (ISNE) | 2.4 GWh | Jan 2022 | Aug 2024 | Solar |
| Independence Road (CSG) | AETS OpCo Holdings LLC | Independence, NY | New York Independent System Operator (NYIS) | 26.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Independence East | AETS OpCo Holdings LLC | Independence, NY | New York Independent System Operator (NYIS) | 238.0 MWh | Jun 2024 | Dec 2024 | Solar |
| Ruhlmann A (CSG) | AETS OpCo Holdings LLC | Lockport, NY | New York Independent System Operator (NYIS) | 371.0 MWh | Oct 2024 | Dec 2024 | Solar |
| State Route 5 | AETS OpCo Holdings LLC | Vernon, NY | New York Independent System Operator (NYIS) | 6.6 GWh | Oct 2023 | Dec 2024 | Solar |
| CAMILLUS A (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Sep 2024 | Dec 2024 | Solar |
| CAMILLUS B (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 1.0 GWh | Sep 2024 | Dec 2024 | Solar |
| Stuyvesant Falls | Albany Engineering Corporation | Stuyvesant, NY | New York Independent System Operator (NYIS) | 11.9 GWh | Nov 2012 | Dec 2024 | Water |
| Fourth Branch Hydroelectric Facility | Albany Engineering Corporation | Waterford, NY | New York Independent System Operator (NYIS) | 10.6 GWh | Nov 1987 | Dec 2024 | Water |
| Green Island Hydroelectric Station | Albany Engineering Corporation | Green Island, NY | New York Independent System Operator (NYIS) | 37.4 GWh | Oct 1922 | Dec 2024 | Water |
| Albany Medical Ctr Cogen Plant | Albany Medical Center | Albany, NY | New York Independent System Operator (NYIS) | 28.8 GWh | Feb 2013 | Dec 2024 | Natural Gas |
| Albert Einstein College of Medicine | Albert Einstein College of Medicine | Bronx, NY | New York Independent System Operator (NYIS) | 11.0 MWh | Dec 2000 | Dec 2024 | Distillate Fuel Oil |
| Allegany Cogen | Allegany Generating Station, LLC | Fillmore, NY | New York Independent System Operator (NYIS) | 15.5 GWh | May 1994 | Dec 2024 | Natural Gas |
| Hillburn | Alliance NYGT, LLC | Hillburn, NY | New York Independent System Operator (NYIS) | 527.0 MWh | Jun 1972 | Dec 2024 | Natural Gas |
| Shoemaker | Alliance NYGT, LLC | Middletown, NY | New York Independent System Operator (NYIS) | 336.0 MWh | Jun 1972 | Nov 2024 | Natural Gas |
| Chambers Road Solar | Altus Power America Management, LLC | Big Flats, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Nov 2020 | Dec 2024 | Solar |
| Castleton | Altus Power America Management, LLC | Castleton on Hudson, NY | New York Independent System Operator (NYIS) | 8.1 GWh | May 2021 | Dec 2024 | Solar |
| 456 Lower | Altus Power America Management, LLC | Minisink, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Sep 2020 | Dec 2024 | Solar |
| 100 Lower | Altus Power America Management, LLC | Minisink, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Apr 2020 | Dec 2024 | Solar |
| Podunk Road CSG | Altus Power America Management, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Jan 2019 | Dec 2024 | Solar |
| Breesport Road Community Solar Farm | Altus Power America Management, LLC | Baldwin, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Sep 2019 | Dec 2024 | Solar |
| Hickory Grove #2 | Altus Power America Management, LLC | Horseheads, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 2020 | Dec 2024 | Solar |
| Pasto Solar | Altus Power America Management, LLC | Spencer, NY | New York Independent System Operator (NYIS) | 23.3 GWh | Sep 2019 | Dec 2024 | Solar |
| Ellis Solar | Altus Power America Management, LLC | Ithaca, NY | New York Independent System Operator (NYIS) | 20.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Hickory Grove #1 | Altus Power America Management, LLC | Horseheads, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2020 | Dec 2024 | Solar |
| Boas Rd #1 Community Solar Farm | Altus Power America Management, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jul 2019 | Dec 2024 | Solar |
| Boas Rd #2 Community Solar Farm | Altus Power America Management, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jul 2019 | Dec 2024 | Solar |
| Boas Rd #3 Community Solar Farm | Altus Power America Management, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jul 2019 | Dec 2024 | Solar |
| Greenville CSG | Altus Power America Management, LLC | Port Jervis, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jul 2019 | Dec 2024 | Solar |
| Chester CSG | Altus Power America Management, LLC | Chester, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jun 2019 | Dec 2024 | Solar |
| Westtown CSG | Altus Power America Management, LLC | Westtown, NY | ISO New England (ISNE) | 3.2 GWh | Apr 2019 | Dec 2024 | Solar |
| Daum Solar | Altus Power America Management, LLC | Rushville, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Dec 2019 | Dec 2024 | Solar |
| Union Vale | Altus Power America Management, LLC | Lagrangeville, NY | New York Independent System Operator (NYIS) | 1.3 GWh | Jul 2021 | Dec 2024 | Solar |
| ELP Myer CSG | Altus Power America Management, LLC | Ulster, NY | New York Independent System Operator (NYIS) | 3.5 GWh | May 2021 | Dec 2024 | Solar |
| Ghent (NY) | Altus Power America Management, LLC | Ghent, NY | New York Independent System Operator (NYIS) | 5.7 GWh | May 2021 | Dec 2024 | Solar |
| Stanford | Altus Power America Management, LLC | Stanfordville, NY | New York Independent System Operator (NYIS) | 7.4 GWh | Jul 2021 | Dec 2024 | Solar |
| East Fishkill CSG | Altus Power America Management, LLC | East Fishkill, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Nov 2019 | Dec 2024 | Solar |
| ELP Greenport CSG | Altus Power America Management, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 7.7 GWh | May 2020 | Dec 2024 | Solar |
| ELP Kinderhook CSG | Altus Power America Management, LLC | Valatie, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Oct 2020 | Dec 2024 | Solar |