Wilkinson DeFore (Safari Energy)
655 Owens Shepard Rd, Gordon, GA 31031Plant Summary Information
Wilkinson DeFore (Safari Energy) is ranked #75 out of 151 solar farms in Georgia in terms of total annual net electricity generation.
Wilkinson DeFore (Safari Energy) generated 1.3 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Wilkinson DeFore (Safari Energy) |
|---|---|
| Utility Name | Safari Energy, LLC |
| Location | Wilkinson County, GA |
| Initial Operation Date | April 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 6.6 GWh |
| Annual Consumption | 23.7 k MMBtu |
| Ranked #7,576 out of 13,081 Power Plants Nationwide | |
| Ranked #3,006 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #154 out of 247 Georgia Power Plants | |
| Ranked #75 out of 151 Georgia Solar Power Plants | |
| Fuel Types | Solar |
Map of Wilkinson DeFore (Safari Energy)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wilkinson DeFore (Safari Energy).
Monthly Net Generation for Wilkinson DeFore (Safari Energy)
Monthly Plant Fuel Consumption for Wilkinson DeFore (Safari Energy)
Wilkinson DeFore (Safari Energy) Details
| Summary Information | |
|---|---|
| Plant Name | Wilkinson DeFore (Safari Energy) (65481) |
| Plant Address | 655 Owens Shepard Rd, Gordon, GA 31031 |
| Utility | Safari Energy, LLC (63640) |
| Latitude, Longitude | 32.8813, -83.3029 |
| Generation Dates on File | Jan 2021 to Dec 2025 |
| Initial Operation Date | April 2020 |
| Annual Generation | 6.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF20-522-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Georgia Power Co (7140) GA |
| Grid Voltage | 0.60 kV |
| Energy Storage | No |
Generator WD Details Operating April 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 55 |
| DC Net Capacity | 4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Wilkinson DeFore (Safari Energy) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2996 | ASA DeKalb NY Solar I LLC | DeKalb, NY | 6.6 GWh |
| #2997 | Belwood Farm | Lawndale, NC | 6.6 GWh |
| #2998 | Bluewater CDEC 1 | Bluewater, NM | 6.6 GWh |
| #2999 | Kearsarge Concord II | Concord, MA | 6.6 GWh |
| #3000 | CSUF Trigeneration | Fullerton, CA | 35.5 GWh |
| #3001 | 1034 Catherine Lake Solar, LLC | Jacksonville, NC | 6.6 GWh |
| #3002 | Paradise Solar Energy Center | West Deptford, NJ | 6.6 GWh |
| #3003 | MA CS Uxbridge Community Solar | Uxbridge, MA | 6.6 GWh |
| #3004 | Butte College Main Campus Solar | Oroville, CA | 6.6 GWh |
| #3005 | Trojan Solar, LLC | Delco, NC | 6.6 GWh |
| #3007 | SSC Oswego II LLC | Oswego, NY | 6.6 GWh |
| #3008 | The Lawrenceville School Solar Facility | Lawrenceville, NJ | 6.6 GWh |
| #3009 | Acme Solar, LLC | Riegelwood, NC | 6.6 GWh |
| #3010 | Kearsarge Montague | Montague, MA | 6.6 GWh |
| #3011 | Riley Road LLC | New Windsor, NY | 6.5 GWh |
| #3012 | Dublin Solar I | Dublin, GA | 6.5 GWh |
| #3013 | ELP - Kipp | Hudson, NY | 6.5 GWh |
| #3014 | Belafonte | Calypso, NC | 6.5 GWh |
| #3015 | GSPP 126 Little Bow Rd S, LLC | Gouverneur, NY | 6.5 GWh |
| #3016 | Canal Road Solar | Franklin, NJ | 6.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wilkinson DeFore (Safari Energy).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ADS Renewable Energy-Wolf Creek LLC | Dry Branch, GA | 11.8 GWh | 10.6 mi |
| AL Sandersville LLC | Warthen, GA | 154.3 GWh | 30.4 mi |
| Arnold Cochran | Cochran, GA | 3.5 GWh | 33.4 mi |
| Bibb Williams | Macob, GA | 4.8 GWh | 14.4 mi |
| Dublin Solar I | Dublin, GA | 6.5 GWh | 30.2 mi |
| Graphic Packaging Intl Macon Mill | Macon, GA | 382.2 GWh | 20.4 mi |
| Mid-Georgia Cogeneration Facility | Kathleen, GA | 154.1 GWh | 32.5 mi |
| Putnam Erickson | Eatonton, GA | 5.6 GWh | 30.6 mi |
| Putnam Erikson 2 | Eatonton, GA | 5.2 GWh | 27.3 mi |
| Richland Solar Center | Jeffersonville, GA | 37.1 GWh | 17.4 mi |
| Robins | Robins AFB, GA | 4.6 GWh | 26.4 mi |
| Robins Air Force Base Solar | Macon, GA | 200.8 GWh | 22.9 mi |
| Scherer | Juliette, GA | 7.6 TWh | 31.8 mi |
| Sinclair Dam | Milledgeville, GA | 105.0 GWh | 18.8 mi |
| Smarr Energy Center | Forsyth, GA | 149.1 GWh | 32.3 mi |
| Tri-County Solar Facility | Eatonton, GA | 1.8 GWh | 29.9 mi |
| Twiggs Solar | Dry Branch, GA | 371.9 GWh | 22 mi |
| Wallace Dam | Eatonton, GA | 1.3 GWh | 33.5 mi |
| Washington County Power LLC | Sandersville, GA | 172.4 GWh | 23.7 mi |
| Wilkinson DeFore (Westbound) | Gordon, GA | 4.3 GWh | 1.1 mi |