Wildcat Wind

2211 Power Plant Lane, Lovington, NM 88260

Plant Summary Information

Wildcat Wind is ranked #24 out of 28 wind farms in New Mexico in terms of total annual net electricity generation.

Wildcat Wind generated 12.6 GWh during the 3-month period between September 2024 to December 2024.

Plant NameWildcat Wind
Utility NameWildcat Wind, LLC
LocationLea County, NM
Initial Operation DateJuly 2012
Last Update Dec 2024
Annual Generation 56.4 GWh
Annual Consumption 208.2 k MMBtu
Ranked #3,946 out of 12,539 Power Plants Nationwide
Ranked #985 out of 1,362 Wind Power Plants Nationwide
Ranked #61 out of 140 New Mexico Power Plants
Ranked #24 out of 28 New Mexico Wind Power Plants
Fuel Types Wind
Previous Operator Wildcat Wind LLC (2013 to 2015)
Wildcat Wind, LLC (2016 to 2024)

Map of Wildcat Wind

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wildcat Wind.

Create Your Account Today

Monthly Net Generation for Wildcat Wind

Wildcat Wind Details

Summary Information
Plant NameWildcat Wind (57887)
Plant Address2211 Power Plant Lane, Lovington, NM 88260
UtilityWildcat Wind, LLC (57257)
Latitude, Longitude32.95278, -103.28528
Generation Dates on FileJul 2012 to Dec 2024
Initial Operation DateJuly 2012
Annual Generation 56.4 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number12-412-000
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket Number12-42-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionMRO
Balancing AuthoritySouthwest Power Pool (SWPP)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerLea County Electric Coop, Inc (10817) NM
Grid Voltage 115.00 kV
Energy StorageNo

Generator 1 Details Operating July 2012

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
RTO ISO LMP Node DesignationWFEC_WILDCAT_WIND_FARM
Nameplate Capacity27.3 MW
Summer Capacity27.3 MW
Winter Capacity27.3 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Turbines/Hydrokinetic Buoys13
Other Planned ModificationsNo
Multiple FuelsNo
Turbine Details
Number Of Turbines13
Predominant Turbine ManufacturerSuzlon
Predominant Turbine Model NumberS97-2100
Design Wind Speed17.8 MPH
Wind Quality Class3 - Low Wind
Turbine Hub Height Feet295.3

Wildcat Wind Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#975VansycleTouchet, OR60.0 GWh
#976Kahuku Wind Power LLCHonolulu, HI59.9 GWh
#977Shirley WindDenmark, WI59.5 GWh
#978Winnebago Wind Power ProjectForest City, IA59.3 GWh
#979Happy Jack Windpower ProjectCheyenne, WY59.3 GWh
#980Rising Tree Wind Farm IIMojave, CA58.7 GWh
#981Silver MapleClifton, ME58.7 GWh
#982Ryegrass WindfarmGlenns Ferry, ID57.9 GWh
#983Crossover WindWynne, AR57.8 GWh
#984Oasis AltaMojave, CA57.0 GWh
#986Milner Dam Wind Park LLCBurley, ID56.2 GWh
#987Big Spring Wind Power FacilityBig Spring, TX56.0 GWh
#988Montfort Wind Energy CenterMontfort, WI55.8 GWh
#989Cold Springs WindfarmGlenns Ferry, ID55.6 GWh
#990Cedar Hills Wind FarmRhame, ND55.6 GWh
#991Crosswind Energy ProjectRuthven, IA55.3 GWh
#992Steel Winds Wind FarmLackawanna, NY54.9 GWh
#993Grant County Wind LLCWoodstock, MN54.9 GWh
#994Oak Creek Energy Systems IMojave, CA54.5 GWh
#995Kaheawa Pastures Wind Farm HybridMaalaea, HI54.3 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Wildcat Wind.

Plant NamePlant LocationAnnual GenerationDistance
Anderson Wind IHagerman, NM9.7 GWh33.5 mi
Anderson Wind IIHagerman, NM26.4 GWh33.9 mi
CunninghamHobbs, NM1.8 TWh17 mi
FrankelAndrews, TX165.0 MWh49.1 mi
Hobbs Generating StationHobbs, NM3.0 TWh15.6 mi
Jumbo Hill Wind ProjectAndrews, TX595.9 GWh43.8 mi
LapetusAndrews, TX226.2 GWh49.3 mi
LCEC Generation LLVCLovington, NM100.7 GWh2.8 mi
MaddoxHobbs, NM536.7 GWh16.5 mi
Middle DaisyLovington, NM13.3 GWh5.3 mi
Mustang StationDenver City, TX2.6 TWh31.5 mi
Mustang Station Unit 4Denver City, TX1.7 TWh31.4 mi
Oso Grande Wind FarmMaljamar, NM628.5 GWh22.1 mi
Prospero SolarAndrews, TX758.9 GWh52.7 mi
Prospero Solar IIAndrews, TX671.4 GWh53.3 mi
SPS3 LeaEunice, NM23.0 GWh33.4 mi
SPS4 MonumentMonument, NM22.9 GWh18.7 mi
Sterling I Wind FarmTatum, NM108.6 GWh28.2 mi
Wasson CO2 Removal PlantDenver City, TX145.6 GWh30.9 mi
Wildcat Ranch Wind ProjectMorton, TX649.0 GWh44 mi