Perdido
12196 Beulah Road, Pensacola, FL 32533Plant Summary Information
Perdido is ranked #9 out of 13 landfill gas power plants in Florida in terms of total annual net electricity generation.
Perdido is comprised of 2 generators and generated 3.8 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Perdido |
---|---|
Utility Name | Florida Power & Light Co |
Location | Escambia County, FL |
Initial Operation Date | October 2010 |
Last Update | Dec 2024 |
Annual Generation | 14.5 GWh |
Annual Consumption | 181.4 k MMBtu |
Ranked #5,549 out of 12,288 Power Plants Nationwide | |
Ranked #182 out of 292 Landfill Gas Power Plants Nationwide | |
Ranked #260 out of 308 Florida Power Plants | |
Ranked #9 out of 13 Florida Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operator |
Gulf Power Co (2013 to 2021) Florida Power & Light Co (2022 to 2024) |
Map of Perdido
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Perdido.
Monthly Net Generation for Perdido
Perdido Details
Summary Information | |
---|---|
Plant Name | Perdido (57502) |
Plant Address | 12196 Beulah Road, Pensacola, FL 32533 |
Utility | Florida Power & Light Co (6452) |
Latitude, Longitude | 30.57, -87.39 |
Generation Dates on File | Oct 2010 to Dec 2024 |
Initial Operation Date | October 2010 |
Annual Generation | 14.5 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Florida Power & Light Company (FPL) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator 1 Details Operating October 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating October 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Perdido Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#172 | Pinconning White Feather | Pinconning, MI | 16.7 GWh |
#173 | Northwest Regional | Surprise, AZ | 16.6 GWh |
#174 | Ameresco Santa Cruz Energy | Watsonville, CA | 16.5 GWh |
#175 | Geneva | Geneva, OH | 16.1 GWh |
#176 | Westside Landfill Gas Recovery | Aledo, TX | 15.7 GWh |
#177 | Frey Farm Landfill | Conestoga, PA | 15.6 GWh |
#178 | Western Berks | Birdsboro, PA | 15.6 GWh |
#179 | Central Generating | Pierson, MI | 15.1 GWh |
#180 | Croda Atlas Point CHP | New Castle, DE | 15.0 GWh |
#181 | CID Gas Recovery | Calumet City, IL | 14.6 GWh |
#183 | Columbia (MO) | Columbia, MO | 21.6 GWh |
#184 | Waxdale | Sturtevant, WI | 38.6 GWh |
#185 | Berlin Landfill Gas | Berlin, WI | 13.6 GWh |
#186 | Woodland Landfill Gas Recovery | South Elgin, IL | 13.6 GWh |
#187 | Tazewell Gas Recovery | East Peoria, IL | 13.5 GWh |
#188 | Nashua Plant | Nashua, NH | 13.4 GWh |
#189 | Onslow Power Producers | Jacksonville, NC | 13.2 GWh |
#190 | Waste Mangement Redwood LFGTE | Novato, CA | 13.1 GWh |
#191 | GLRA Landfill | Lebanon, PA | 13.1 GWh |
#192 | Frederick County LFGTE Facility | Winchester, VA | 13.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Perdido.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barry | Bucks, AL | 14.3 TWh | 47.6 mi |
Big Juniper Solar | TBD, FL | 142.4 GWh | 28 mi |
Blackwater River Solar Energy Center | Milton, FL | 138.6 GWh | 27.4 mi |
Canoe | Holt, FL | 145.1 GWh | 37 mi |
Cotton Creek Solar Energy Center | McDavid, FL | 131.1 GWh | 19 mi |
First City Solar Energy Center | McDavid, FL | 126.1 GWh | 24.4 mi |
Georgia-Pacific Brewton Mill | Brewton, AL | 499.4 GWh | 38.7 mi |
Gulf Clean Energy Center | Pensacola, FL | 2.6 TWh | 9.9 mi |
Gulf Coast Solar Center II | Navarre, FL | 79.4 GWh | 31 mi |
Gulf Coast Solar Center III | Bellview, FL | 89.6 GWh | 7.6 mi |
Hog Bayou Energy Center | Mobile, AL | 1.0 TWh | 41.5 mi |
International Paper Pensacola | Cantonment, FL | 343.9 GWh | 4.2 mi |
Kimberly Clark Mobile - CHP Plant | Mobile, AL | 367.8 GWh | 40.9 mi |
Mitchell Creek | TBD, FL | 52.3 GWh | 25.9 mi |
Pea Ridge | Pace, FL | 88.2 GWh | 15.2 mi |
Pensacola Florida Plant | Cantonment, FL | 510.6 GWh | 8.4 mi |
Santa Rosa Energy Center | Pace, FL | 1.3 TWh | 16.4 mi |
Sparkleberry | Molino, FL | 165.9 GWh | 13.6 mi |
Standby Generation Plant | Pensacola, FL | 10.0 MWh | 11.3 mi |
Theodore Cogen Facility | Theodore, AL | 1.6 TWh | 44 mi |