Head of U Canal Hydro Project
275 North 650 East, Jerome, ID 83338Plant Summary Information
Head of U Canal Hydro Project is ranked #64 out of 74 hydroelectric power plants in Idaho in terms of total annual net electricity generation.
Head of U Canal Hydro Project is comprised of 1 generator and generated 1.8 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Head of U Canal Hydro Project |
---|---|
Utility Name | North Side Energy Company |
Location | Jerome County, ID |
Initial Operation Date | June 2015 |
Last Update | Oct 2024 |
Annual Generation | 4.5 GWh |
Annual Consumption | 16.3 k MMBtu |
Ranked #8,116 out of 12,299 Power Plants Nationwide | |
Ranked #1,149 out of 1,323 Water Power Plants Nationwide | |
Ranked #128 out of 140 Idaho Power Plants | |
Ranked #64 out of 74 Idaho Water Power Plants | |
Fuel Types | Water |
Map of Head of U Canal Hydro Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Head of U Canal Hydro Project.
Monthly Net Generation for Head of U Canal Hydro Project
Head of U Canal Hydro Project Details
Summary Information | |
---|---|
Plant Name | Head of U Canal Hydro Project (61217) |
Plant Address | 275 North 650 East, Jerome, ID 83338 |
Utility | North Side Energy Company (60851) |
Latitude, Longitude | 42.7628, -114.3958 |
Generation Dates on File | Jan 2016 to Oct 2024 |
Initial Operation Date | June 2015 |
Annual Generation | 4.5 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | CD14-10-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Idaho Power Company (IPCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Snake River |
Ash Impoundment | No |
Transmission / Distribution Owner | Idaho Power Co (9191) ID |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator HY1 Details Operating June 2015
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Head of U Canal Hydro Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1139 | Little Wood Hydro Project | Carey, ID | 4.8 GWh |
#1140 | Port Leyden Hydroelectric Project | Port Leyden, NY | 4.7 GWh |
#1141 | Pelzer Upper | Petzer, SC | 4.7 GWh |
#1142 | Pelzer Lower | Williamston, SC | 4.7 GWh |
#1143 | Upper Barker | Auburn, ME | 4.7 GWh |
#1144 | Hydro Plant No 3 | east of Ephraim, UT | 4.6 GWh |
#1145 | Radford | Radford, VA | 4.6 GWh |
#1146 | Silver Lake (VT) | Salisbury, VT | 4.6 GWh |
#1147 | North Gooding Main Hydro | Gooding, ID | 4.6 GWh |
#1148 | Marys Lake | Estes Park, CO | 4.5 GWh |
#1150 | Franklin (NC) | Franklin, NC | 4.5 GWh |
#1151 | Ottumwa City of | Ottumwa, IA | 4.5 GWh |
#1152 | Piedmont Hydro Power Project | Piedmont, SC | 4.5 GWh |
#1153 | Last Chance | Grace, ID | 4.5 GWh |
#1154 | Chasm Hydro Partnership | Chateaugay, NY | 4.4 GWh |
#1155 | Blind Canyon Hydro | Wendell, ID | 4.4 GWh |
#1156 | Cabot Holyoke | Holyoke, MA | 4.4 GWh |
#1157 | Theresa Plant | Theresa, NY | 4.4 GWh |
#1158 | Hiilangaay Hydro | Hydaburg, AK | 4.4 GWh |
#1159 | Scott Flat | Nevada City, CA | 4.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Head of U Canal Hydro Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AJMS, LLC | Shoshone, ID | 3.8 GWh | 15.1 mi |
Amalgamated Sugar Twin Falls | Twin Falls, ID | 28.5 GWh | 16 mi |
Clear Lake | Buhl, ID | 16.7 GWh | 20.6 mi |
Clif Bar Bakery of Twin Falls | Twin Falls, ID | 2.8 GWh | 15.4 mi |
Crystal Springs | Filer, ID | 9.4 GWh | 11.1 mi |
Dietrich Drop | Shoshone, ID | 8.3 GWh | 8.2 mi |
GeoBon II | Shoshone, ID | 3.5 GWh | 13.7 mi |
Hazelton B Hydro | Hazelton, ID | 24.2 GWh | 18.8 mi |
Little Mac Project | Buhl, ID | 5.0 GWh | 16.3 mi |
Marco Ranch | Jerome, ID | 2.5 GWh | 12 mi |
Mile 28 Water Power Project | Eden, ID | 5.3 GWh | 12 mi |
North Gooding Main Hydro | Gooding, ID | 4.6 GWh | 21.2 mi |
Rock Creek I | Twin Falls, ID | 10.6 GWh | 11.6 mi |
Rock Creek II | Twin Falls, ID | 5.8 GWh | 12 mi |
S E Hazelton A | Hazelton, ID | 24.7 GWh | 20.6 mi |
Shoshone Falls | Twin Falls, ID | 71.3 GWh | 11.4 mi |
South Forks Hydro | Hansen, ID | 26.0 GWh | 19.1 mi |
Twin Falls (ID) | Kimberly, ID | 101.0 GWh | 12.2 mi |
West Point RNG | Wendell, ID | 5.2 GWh | 12.7 mi |
Wilson Lake Hydroelectric Project | Eden, ID | 28.7 GWh | 14.5 mi |