Head of U Canal Hydro Project
275 North 650 East, Jerome, ID 83338Plant Summary Information
Head of U Canal Hydro Project is ranked #65 out of 75 hydroelectric power plants in Idaho in terms of total annual net electricity generation.
Head of U Canal Hydro Project is comprised of 1 generator and generated 1.8 GWh during the 3-month period between July 2024 to October 2024.
| Plant Name | Head of U Canal Hydro Project |
|---|---|
| Utility Name | North Side Energy Company |
| Location | Jerome County, ID |
| Initial Operation Date | June 2015 |
| Last Update | Oct 2024 |
| Annual Generation | 4.5 GWh |
| Annual Consumption | 16.3 k MMBtu |
| Ranked #8,242 out of 12,539 Power Plants Nationwide | |
| Ranked #1,155 out of 1,332 Water Power Plants Nationwide | |
| Ranked #129 out of 141 Idaho Power Plants | |
| Ranked #65 out of 75 Idaho Water Power Plants | |
| Fuel Types | Water |
Map of Head of U Canal Hydro Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Head of U Canal Hydro Project.
Monthly Net Generation for Head of U Canal Hydro Project
Head of U Canal Hydro Project Details
| Summary Information | |
|---|---|
| Plant Name | Head of U Canal Hydro Project (61217) |
| Plant Address | 275 North 650 East, Jerome, ID 83338 |
| Utility | North Side Energy Company (60851) |
| Latitude, Longitude | 42.7628, -114.3958 |
| Generation Dates on File | Jan 2016 to Oct 2024 |
| Initial Operation Date | June 2015 |
| Annual Generation | 4.5 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | CD14-10-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Idaho Power Company (IPCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Snake River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Idaho Power Co (9191) ID |
| Grid Voltage | 12.50 kV |
| Energy Storage | No |
Generator HY1 Details Operating June 2015
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Head of U Canal Hydro Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1145 | Little Wood Hydro Project | Carey, ID | 4.8 GWh |
| #1146 | Port Leyden Hydroelectric Project | Port Leyden, NY | 4.7 GWh |
| #1147 | Pelzer Upper | Petzer, SC | 4.7 GWh |
| #1148 | Pelzer Lower | Williamston, SC | 4.7 GWh |
| #1149 | Upper Barker | Auburn, ME | 4.7 GWh |
| #1150 | Hydro Plant No 3 | east of Ephraim, UT | 4.6 GWh |
| #1151 | Radford | Radford, VA | 4.6 GWh |
| #1152 | Silver Lake (VT) | Salisbury, VT | 4.6 GWh |
| #1153 | North Gooding Main Hydro | Gooding, ID | 4.6 GWh |
| #1154 | Marys Lake | Estes Park, CO | 4.5 GWh |
| #1156 | Franklin (NC) | Franklin, NC | 4.5 GWh |
| #1157 | Ottumwa City of | Ottumwa, IA | 4.5 GWh |
| #1158 | Piedmont Hydro Power Project | Piedmont, SC | 4.5 GWh |
| #1159 | Last Chance | Grace, ID | 4.5 GWh |
| #1160 | Chasm Hydro Partnership | Chateaugay, NY | 4.4 GWh |
| #1161 | Blind Canyon Hydro | Wendell, ID | 4.4 GWh |
| #1162 | Dunlap TP 1 | New Brannfels, TX | 4.4 GWh |
| #1163 | Cabot Holyoke | Holyoke, MA | 4.4 GWh |
| #1164 | Tallassee Hydro Project | Clarke, GA | 4.4 GWh |
| #1165 | Theresa Plant | Theresa, NY | 4.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Head of U Canal Hydro Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AJMS, LLC | Shoshone, ID | 3.8 GWh | 15.1 mi |
| Amalgamated Sugar Twin Falls | Twin Falls, ID | 28.5 GWh | 16 mi |
| Clear Lake | Buhl, ID | 16.7 GWh | 20.6 mi |
| Clif Bar Bakery of Twin Falls | Twin Falls, ID | 2.7 GWh | 15.4 mi |
| Crystal Springs | Filer, ID | 9.4 GWh | 11.1 mi |
| Dietrich Drop | Shoshone, ID | 8.3 GWh | 8.2 mi |
| GeoBon II | Shoshone, ID | 3.5 GWh | 13.7 mi |
| Hazelton B Hydro | Hazelton, ID | 24.2 GWh | 18.8 mi |
| Little Mac Project | Buhl, ID | 5.0 GWh | 16.3 mi |
| Low Line Rapids | Kimberly, ID | 8.7 GWh | 19.8 mi |
| Marco Ranch | Jerome, ID | 2.5 GWh | 12 mi |
| Mile 28 Water Power Project | Eden, ID | 5.3 GWh | 12 mi |
| Rock Creek I | Twin Falls, ID | 10.6 GWh | 11.6 mi |
| Rock Creek II | Twin Falls, ID | 5.8 GWh | 12 mi |
| S E Hazelton A | Hazelton, ID | 24.7 GWh | 20.6 mi |
| Shoshone Falls | Twin Falls, ID | 71.3 GWh | 11.4 mi |
| South Forks Hydro | Hansen, ID | 26.0 GWh | 19.1 mi |
| Twin Falls (ID) | Kimberly, ID | 101.0 GWh | 12.2 mi |
| West Point RNG | Wendell, ID | 5.2 GWh | 12.7 mi |
| Wilson Lake Hydroelectric Project | Eden, ID | 28.7 GWh | 14.5 mi |