Manti Upper
5000 East 500 South, Manti, UT 84642Plant Summary Information
Manti Upper is ranked #26 out of 27 hydroelectric power plants in Utah in terms of total annual net electricity generation.
Manti Upper is comprised of 2 generators and generated 191.0 MWh during the 3-month period between January 2024 to April 2024.
Plant Name | Manti Upper |
---|---|
Utility Name | City of Manti - (UT) |
Location | Sanpete County, UT |
Initial Operation Date | January 1939 |
Last Update | Apr 2024 |
Annual Generation | 464.0 MWh |
Annual Consumption | 1.6 k MMBtu |
Ranked #11,481 out of 12,299 Power Plants Nationwide | |
Ranked #1,306 out of 1,323 Water Power Plants Nationwide | |
Ranked #114 out of 120 Utah Power Plants | |
Ranked #26 out of 27 Utah Water Power Plants | |
Fuel Types | Water |
Map of Manti Upper
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Manti Upper.
Monthly Net Generation for Manti Upper
Manti Upper Details
Summary Information | |
---|---|
Plant Name | Manti Upper (3676) |
Plant Address | 5000 East 500 South, Manti, UT 84642 |
Utility | City of Manti - (UT) (11588) |
Latitude, Longitude | 39.25591, -111.62149 |
Generation Dates on File | Jan 2001 to Apr 2024 |
Initial Operation Date | January 1939 |
Annual Generation | 464.0 MWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Cullinary |
Ash Impoundment | |
Transmission / Distribution Owner | City of Manti - (UT) (11588) UT |
Grid Voltage | 4.00 kV |
Energy Storage | No |
Generator 1 Details Operating January 1939
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1939 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HC2 Details Operating January 1988
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1988 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Manti Upper Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1296 | Walden | Walden, NY | 840.0 MWh |
#1297 | Cavendish | Cavendish, VT | 830.0 MWh |
#1298 | Manti Lower | Manti, UT | 802.0 MWh |
#1299 | Cosgrove Intake and Power Station | Clinton, MA | 738.0 MWh |
#1300 | Dunlap TP 1 | New Brannfels, TX | 673.0 MWh |
#1301 | Talcville | Edwards, NY | 601.0 MWh |
#1302 | C-Drop Hydro | Klamath Falls, OR | 574.0 MWh |
#1303 | W K Sanders | Hyde Park, VT | 548.0 MWh |
#1304 | Niangua | Camdenton, MO | 542.0 MWh |
#1305 | Rocky Brook Hydroelectric | Brinnon, WA | 540.0 MWh |
#1307 | Squa Pan Hydro Station | Masardis, ME | 426.0 MWh |
#1308 | Prospect 4 | Prospect, OR | 417.0 MWh |
#1309 | Kearney | Kearney, NE | 416.0 MWh |
#1310 | Barron | Barron, WI | 342.0 MWh |
#1311 | Kings River Syphon | Sanger, CA | 325.0 MWh |
#1312 | Thief River Falls | Thief River Falls, MN | 285.0 MWh |
#1313 | Bartholomew | Springville, UT | 271.0 MWh |
#1314 | Lanesboro | Lanesboro, MN | 184.0 MWh |
#1315 | Cadys Falls | Morrisville, VT | 139.0 MWh |
#1316 | Georgia-Pacific Big Island | Big Island, VA | 52.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Manti Upper.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Castle Solar, LLC | Huntington, UT | 108.1 GWh | 34.2 mi |
Clover Creek Solar Community Solar | Mona, UT | 202.3 GWh | 42.8 mi |
Currant Creek | Mona, UT | 2.7 TWh | 41.7 mi |
Graphite Solar I | Wellington, UT | 190.3 GWh | 52.6 mi |
Gunnison Solar | Gunnison, UT | 3.7 GWh | 11.4 mi |
Hunter | Castle Dale, UT | 5.5 TWh | 32.2 mi |
Hunter Solar LLC (UT) | Clawson, UT | 271.1 GWh | 31.5 mi |
Huntington | Huntington, UT | 3.3 TWh | 30.3 mi |
Hydro Plant No 3 | east of Ephraim, UT | 4.6 GWh | 15.8 mi |
Intermountain Power Project | Delta, UT | 6.9 TWh | 54.1 mi |
Manti Lower | Manti, UT | 802.0 MWh | 0 mi |
Nebo Power Station | Payson, UT | 824.3 GWh | 55.9 mi |
Pavant Solar II LLC | Fillmore, UT | 80.3 GWh | 39.2 mi |
Pavant Solar III | Filmore, UT | 43.6 GWh | 40.1 mi |
Pavant Solar, LLC | Fillmore, UT | 113.6 GWh | 44.7 mi |
Payson | Payson, UT | 4.0 MWh | 55.9 mi |
Sigurd Solar LLC | Sigurd, UT | 203.0 GWh | 34.8 mi |
Spanish Fork | Spanish Fork, UT | 11.5 GWh | 56.9 mi |
Spanish Fork Wind Park 2 LLC | Spanish Fork, UT | 45.2 GWh | 56.4 mi |
Unit 4 | Mt Pleasent, UT | 2.3 GWh | 22.7 mi |