HEB00797
24924 Morton Ranch Road, Katy, TX 77493Plant Summary Information
HEB00797 is ranked #309 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.
HEB00797 is comprised of 3 generators and generated 71.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | HEB00797 |
|---|---|
| Utility Name | Generate ER-NG, LLC |
| Location | Harris County, TX |
| Initial Operation Date | December 2024 |
| Last Update | Dec 2024 |
| Annual Generation | 71.0 MWh |
| Annual Consumption | 1.2 k MMBtu |
| Ranked #12,184 out of 12,539 Power Plants Nationwide | |
| Ranked #2,157 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #791 out of 799 Texas Power Plants | |
| Ranked #309 out of 314 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of HEB00797
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for HEB00797.
Monthly Net Generation for HEB00797
HEB00797 Details
| Summary Information | |
|---|---|
| Plant Name | HEB00797 (68732) |
| Plant Address | 24924 Morton Ranch Road, Katy, TX 77493 |
| Utility | Generate ER-NG, LLC (64897) |
| Latitude, Longitude | 29.81723, -95.80365 |
| Generation Dates on File | Dec 2024 to Dec 2024 |
| Initial Operation Date | December 2024 |
| Annual Generation | 71.0 MWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | CENTERPOINT ENERGY |
| Natural Gas Storage | No |
Generator H7971 Details Operating December 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator H7972 Details Operating December 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator H7973 Details Operating December 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
HEB00797 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2147 | Litchfield | Litchfield, MN | 143.0 MWh |
| #2148 | University of Alaska Fairbanks | Fairbanks, AK | 64.3 GWh |
| #2149 | HEB00794 | McKinney, TX | 89.0 MWh |
| #2150 | Minneapolis City of | Minneapolis, KS | 99.0 MWh |
| #2151 | Baldwin City Plant No 2 | Baldwin City, KS | 199.0 MWh |
| #2152 | US Magnesium | Rowley, UT | 82.3 MWh |
| #2153 | Nine Springs | Madison, WI | 82.0 MWh |
| #2154 | Russell Downtown | Russell, KS | 87.0 MWh |
| #2155 | Cumberland (WI) | Cumberland, WI | 260.0 MWh |
| #2156 | West Point Municipal | West Point, NE | 109.0 MWh |
| #2158 | Des Moines Wastewater Reclamation Fac | Des Moines, IA | 70.6 MWh |
| #2159 | Regional Wastewater Control Facility | Stockton, CA | 3.1 GWh |
| #2160 | Walton Discover Power Facility | Smiths, AL | 69.0 MWh |
| #2161 | Meade | Meade, KS | 85.0 MWh |
| #2162 | Q Plant | San Diego, CA | 66.0 MWh |
| #2163 | Municipal Power Plant | Zeeland, MI | 63.0 MWh |
| #2164 | Preston (MN) | Preston, MN | 163.0 MWh |
| #2165 | Berlin | Berlin, MD | 157.0 MWh |
| #2166 | Jackson (MO) | Jackson, MO | 146.0 MWh |
| #2167 | Belleville | Belleville, KS | 205.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding HEB00797.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| BUC00040 | Katy, TX | 283.0 MWh | 2 mi |
| Clara | Houston, TX | 209.0 MWh | 15.1 mi |
| HEB00020 | Cypress, TX | 254.0 MWh | 12.6 mi |
| HEB00109 | Katy, TX | 303.0 MWh | 16 mi |
| HEB00776 | Katy, TX | 165.0 MWh | 2.8 mi |
| HEBHoustonDistributionCenter | Houston, TX | 6.4 GWh | 16.1 mi |
| HEBSnackPlant | Houston, TX | 388.0 MWh | 15.9 mi |
| OTHERNFBWA | Houston, TX | 321.0 MWh | 13.5 mi |
| Stonegate | Katy, TX | 234.0 MWh | 4.8 mi |
| WAL1040 | Houston, TX | 324.0 MWh | 10 mi |
| WAL2993 | Sugar Land, TX | 255.0 MWh | 17 mi |
| WAL3226 | Katy, TX | 312.0 MWh | 2.3 mi |
| WAL3297 | Houston, TX | 290.0 MWh | 14 mi |
| WAL3827 | Richmond, TX | 224.0 MWh | 9 mi |
| WAL4512 | Katy, TX | 348.0 MWh | 2.1 mi |
| WAL4538 | Katy, TX | 192.0 MWh | 5.1 mi |
| WAL5091 | Cypress, TX | 288.0 MWh | 12.7 mi |
| WAL768 | Katy, TX | 171.0 MWh | 5.3 mi |
| WAL772 | Houston, TX | 198.0 MWh | 11.5 mi |
| Westhollow Technology Center | Houston, TX | 17.4 GWh | 11.8 mi |