Corning
501 Benton Avenue, Corning, IA 50841Plant Summary Information
Corning is ranked #82 out of 92 distillate fuel oil power plants in Iowa in terms of total annual net electricity generation.
Corning is comprised of 3 generators and generated 6.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Corning |
|---|---|
| Utility Name | City of Corning - (IA) |
| Location | Adams County, IA |
| Initial Operation Date | June 1975 |
| Last Update | Dec 2025 |
| Annual Generation | 6.0 MWh |
| Annual Consumption | 122 MMBtu |
| Ranked #13,024 out of 13,081 Power Plants Nationwide | |
| Ranked #1,156 out of 1,233 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #275 out of 283 Iowa Power Plants | |
| Ranked #82 out of 92 Iowa Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of Corning
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Corning.
Monthly Net Generation for Corning
Monthly Plant Fuel Consumption for Corning
Corning Details
| Summary Information | |
|---|---|
| Plant Name | Corning (1134) |
| Plant Address | 501 Benton Avenue, Corning, IA 50841 |
| Utility | City of Corning - (IA) (4375) |
| Latitude, Longitude | 40.9871, -94.7352 |
| Generation Dates on File | Jan 2002 to Dec 2025 |
| Initial Operation Date | June 1975 |
| Annual Generation | 6.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Corning - (IA) (4375) IA |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator 5 Details Standby June 1975
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ALTW.ALTW |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | ALTW.ALTW |
| Nameplate Capacity | 2.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2.8 MW |
| Winter Capacity | 2.8 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
|---|---|
| First Operation Date | June 1975 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 6 Details Standby March 2006
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ALTW.ALTW |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | ALTW.ALTW |
| Nameplate Capacity | 2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
|---|---|
| First Operation Date | March 2006 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 7 Details Standby March 2006
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ALTW.ALTW |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | ALTW.ALTW |
| Nameplate Capacity | 2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
|---|---|
| First Operation Date | March 2006 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Corning Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1146 | Walton Street Substation | Farmington, MO | 7.0 MWh |
| #1147 | Earlville | Earlville, IA | 7.0 MWh |
| #1148 | Brooklyn City North Plant | Brooklyn, IA | 7.0 MWh |
| #1149 | Alliant SBD 9206 Donaldson | Cresco, IA | 6.9 MWh |
| #1150 | Monroe Generating Station | Monroe, NC | 1.6 GWh |
| #1151 | Pleasant Hill | Pleasant Hill, IA | 48.7 GWh |
| #1152 | University of Colorado | Boulder, CO | 4.6 GWh |
| #1153 | Lagoon Creek | Brownsville, TN | 3.5 TWh |
| #1154 | Trinidad (CO) | Trinidad, CO | 6.0 MWh |
| #1155 | Peru (IN) | Peru, IN | 6.0 MWh |
| #1157 | Rockford | Rockford, IA | 6.0 MWh |
| #1158 | Fairfax | Fairfax, MN | 6.0 MWh |
| #1159 | East 12th Street | Winfield, KS | 10.5 GWh |
| #1160 | Murphy-Brown LLC | Warsaw, NC | 6.0 MWh |
| #1161 | Waste Water Plant Generator | Winfield, KS | 6.0 MWh |
| #1162 | Traer East | Tracer, IA | 6.0 MWh |
| #1163 | Emory Hillandale Hospital | Lithonia, GA | 6.0 MWh |
| #1164 | Catawba River Pollution Control | Morganton, NC | 6.0 MWh |
| #1165 | Fredonia (KS) | Fredonia, KS | 6.0 MWh |
| #1166 | Fordham University | Bronx, NY | 6.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Corning.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adams Wind | Lenox, IA | 460.4 GWh | 5.7 mi |
| August Wind Farm | Clearfield, IA | 6.2 GWh | 20.5 mi |
| Birch | Clearfield, IA | 6.6 GWh | 20.4 mi |
| Bulldog | Orient, IA | 4.3 GWh | 22.5 mi |
| Contrail Wind Farm | Bedford, IA | 340.7 GWh | 22.7 mi |
| Creston School Customer Hosted Solar | Creston, IA | 1.4 GWh | 19.7 mi |
| Creston Solar (50 MW) | Creston, IA | 96.4 GWh | 22.5 mi |
| Cumberland Rose | Orient, IA | 4.0 GWh | 22.8 mi |
| Downtown Generation Plant | Greenfield, IA | 15.0 MWh | 26.1 mi |
| Fontanelle | Fontanelle, IA | 4.9 GWh | 25.8 mi |
| Greenfield Wind | Greenfield, IA | 4.4 GWh | 24.6 mi |
| Lenox | Lenox, IA | 55.0 MWh | 11.8 mi |
| Orient Wind Farm | Orient, IA | 1.8 TWh | 22.3 mi |
| POET Biorefining LLC - Corning | Corning, IA | 14.0 GWh | 3.5 mi |
| Prescott Wind Farm | Prescott, IA | 162.0 GWh | 11.5 mi |
| Rolling Hills Wind Farm | Massena, IA | 1.6 TWh | 14.7 mi |
| Sky Volt | Greenfield, IA | 4.5 GWh | 24.6 mi |
| Southern Hills Wind Farm | Creston, IA | 808.2 GWh | 16.4 mi |
| Summit Lake | Creston, IA | 109.3 GWh | 22 mi |
| Villisca Municipal Power Plant | Villisca, IA | 22.0 MWh | 13.6 mi |