Burlingame
204 West Lincoln, Burlingame, KS 66413Plant Summary Information
Burlingame is ranked #52 out of 56 natural gas power plants in Kansas in terms of total annual net electricity generation.
Burlingame is comprised of 4 generators and generated 2.2 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Burlingame |
|---|---|
| Utility Name | City of Burlingame - (KS) |
| Location | Osage County, KS |
| Initial Operation Date | August 1963 |
| Last Update | Dec 2025 |
| Annual Generation | 9.0 MWh |
| Annual Consumption | 158 MMBtu |
| Ranked #13,002 out of 13,081 Power Plants Nationwide | |
| Ranked #2,173 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #166 out of 175 Kansas Power Plants | |
| Ranked #52 out of 56 Kansas Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 95.7% Distillate Fuel Oil : 4.3% |
Map of Burlingame
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Burlingame.
Monthly Net Generation for Burlingame
Monthly Plant Fuel Consumption for Burlingame
Burlingame Details
| Summary Information | |
|---|---|
| Plant Name | Burlingame (1265) |
| Plant Address | 204 West Lincoln, Burlingame, KS 66413 |
| Utility | City of Burlingame - (KS) (2547) |
| Latitude, Longitude | 38.7551, -95.8368 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | August 1963 |
| Annual Generation | 9.0 MWh |
| Fuel Types | Natural Gas : 95.7% Distillate Fuel Oil : 4.3% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality/Burlingame |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Evergy Kansas Central, Inc (22500) KS |
| Grid Voltage | 24.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | BURLINGAME CITY OF |
| Pipeline Name | SOUTHERN STAR CENTRAL GAS PIPELINE |
| Natural Gas Storage | No |
Generator 3 Details Operating August 1963
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.9 MW |
| Nameplate Power Factor | 0.99 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1963 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
Generator 4 Details Operating August 1969
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.1 MW |
| Nameplate Power Factor | 0.99 |
| Summer Capacity | 1 MW |
| Winter Capacity | 1.1 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1969 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
Generator 1 Details Operating August 1973
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.1 MW |
| Nameplate Power Factor | 0.99 |
| Summer Capacity | 1 MW |
| Winter Capacity | 1.1 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1973 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
Generator 5 Details Operating January 1980
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.9 MW |
| Nameplate Power Factor | 0.99 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 1980 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
Burlingame Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2163 | Preston (MN) | Preston, MN | 78.0 MWh |
| #2164 | Auburn | Auburn, NE | 31.0 MWh |
| #2165 | Rockland Bakery Inc. | Nanuet, NY | 22.0 MWh |
| #2166 | Missouri River Wastewater Treatment | Omaha, NE | 10.2 GWh |
| #2167 | Winterset | Winterset, IA | 33.0 MWh |
| #2168 | Anthony | Anthony, KS | 13.0 MWh |
| #2169 | WAL1455 | Fort Worth, TX | 12.0 MWh |
| #2170 | Osborne | Osborne, KS | 30.4 MWh |
| #2171 | Moose Lake | Moose Lake, MN | 128.0 MWh |
| #2172 | CCSU Co-Gen-STBY Gen | New Britain, CT | 9.8 MWh |
| #2174 | Sterling | Sterling, KS | 22.0 MWh |
| #2175 | Hoisington | Hoisington, KS | 39.0 MWh |
| #2176 | Standby Generation Plant | Pensacola, FL | 8.0 MWh |
| #2177 | Water Reclamation Plant | Rochester, MN | 3.7 GWh |
| #2178 | Preston (IA) | Preston, IA | 9.0 MWh |
| #2179 | Kingfisher | Kingfisher, OK | 24.0 MWh |
| #2180 | Alliant SBG 9802 Toyota | Cedar Rapids, IA | 6.3 MWh |
| #2181 | Bay View Backup Power Facility | Toledo, OH | 629.0 MWh |
| #2182 | Girard | Girard, KS | 41.0 MWh |
| #2183 | Payson | Payson, UT | 6.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Burlingame.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Americus | Emporia, KS | 2.2 GWh | 22 mi |
| Baldwin City Plant No 1 | Baldwin City, KS | 13.0 MWh | 35 mi |
| Baldwin City Plant No 2 | Baldwin City, KS | 122.0 MWh | 34.7 mi |
| Burlington (KS) | Burlington, KS | 207.0 MWh | 39.1 mi |
| Emporia Energy Center | Emporia, KS | 634.2 GWh | 24.7 mi |
| FreeState Crooked Post Solar I | Topeka, KS | 3.4 GWh | 16.5 mi |
| FreeState Kiro Solar I | Silver Lake, KS | 2.2 GWh | 24.6 mi |
| FreeState Stull Solar I | LeCompton, KS | 2.9 GWh | 27.4 mi |
| Jeffrey Energy Center | St. Mary's, KS | 7.5 TWh | 39.7 mi |
| Kansas River Project | Lawrence, KS | 26.7 GWh | 35.7 mi |
| Lawrence Energy Center | Lawrence, KS | 1.6 TWh | 35.1 mi |
| Osage City Solar | Osage City, KS | 3.1 GWh | 7.2 mi |
| Oskaloosa | Oskaloosa, KS | 2.1 GWh | 38.5 mi |
| Reading Wind Project | Reading, KS | 665.7 GWh | 20.6 mi |
| Thunderbird Generator (Tbird) | Emporia, KS | 75.0 MWh | 30 mi |
| Waste Management Rolling Meadows LFGTE | Topeka, KS | 48.1 GWh | 29.5 mi |
| Waverly Wind Farm LLC | Waverly, KS | 701.2 GWh | 34.4 mi |
| West Gardner | Johnson, KS | 239.2 GWh | 45.9 mi |
| Wolf Creek Generating Station | Burlington, KS | 9.3 TWh | 36.5 mi |
| Wolf Creek Generator | Burlington, KS | 106.0 MWh | 34.2 mi |