CBEP Solar 4, LLC
11650 Co Rd 46, Milliken, CO 80543Plant Summary Information
CBEP Solar 4, LLC is ranked #43 out of 153 solar farms in Colorado in terms of total annual net electricity generation.
CBEP Solar 4, LLC generated 1.4 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | CBEP Solar 4, LLC |
---|---|
Utility Name | Green Street Power Partners |
Location | Weld County, CO |
Initial Operation Date | November 2023 |
Last Update | Dec 2024 |
Annual Generation | 7.9 GWh |
Annual Consumption | 27.1 k MMBtu |
Ranked #6,809 out of 12,299 Power Plants Nationwide | |
Ranked #2,297 out of 6,182 Solar Power Plants Nationwide | |
Ranked #141 out of 283 Colorado Power Plants | |
Ranked #43 out of 153 Colorado Solar Power Plants | |
Fuel Types | Solar |
Map of CBEP Solar 4, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CBEP Solar 4, LLC.
Monthly Net Generation for CBEP Solar 4, LLC
CBEP Solar 4, LLC Details
Summary Information | |
---|---|
Plant Name | CBEP Solar 4, LLC (67466) |
Plant Address | 11650 Co Rd 46, Milliken, CO 80543 |
Utility | Green Street Power Partners (62719) |
Latitude, Longitude | 40.31919, -104.83624 |
Generation Dates on File | Jan 2024 to Dec 2024 |
Initial Operation Date | November 2023 |
Annual Generation | 7.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF23-849-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of Colorado (PSCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Public Service Co of Colorado (15466) CO |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator CBEP4 Details Operating November 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4 MW |
Summer Capacity | 4 MW |
Winter Capacity | 4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 5.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
CBEP Solar 4, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2287 | 299 Farm to Market Rd Hybrid(CSG) | Wareham, MA | 7.9 GWh |
#2288 | SunE Feely 1 CSG, LLC | Farmington, MN | 8.0 GWh |
#2289 | Niagara Bottling - Seguin | Seguin, TX | 8.0 GWh |
#2290 | Farmington Holdco Solar | Farmington, MN | 8.0 GWh |
#2291 | Happy Hollow CSG Hybrid | Winchendon, MA | 8.0 GWh |
#2292 | Owen Solar | Lincolnton, NC | 8.0 GWh |
#2293 | Taylors Falls CSG | Taylor Falls, MN | 8.0 GWh |
#2294 | Cokato CSG | Cokato, MN | 8.0 GWh |
#2295 | Gliden (Op Zone) | Tyner, NC | 8.0 GWh |
#2296 | CalCity Solar 1 | California City, CA | 7.9 GWh |
#2298 | Saratoga Solar LLC | Milton, NY | 7.9 GWh |
#2299 | Sangerfield Solar CSG | Waterville, NY | 7.9 GWh |
#2300 | Cortlandville III Solar CSG | Cortland, NY | 7.9 GWh |
#2301 | Gastonia Solar Center | Gastonia, NC | 7.9 GWh |
#2302 | Waynesboro Bridge Solar, LLC Community S | Waynesboro, VA | 7.9 GWh |
#2303 | Benson Solar, LLC | Benson, NC | 7.9 GWh |
#2304 | Ursa Community Solar | Farmington, MN | 7.9 GWh |
#2305 | Syncarpha Taos | Taos, NM | 7.9 GWh |
#2306 | 28 Livermore Hill Road Solar | Westminster, MA | 7.9 GWh |
#2307 | Hwy 14 Holdco Solar CSG | Byron, MN | 7.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CBEP Solar 4, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
CBEP Solar 5, LLC | Johnstown, CO | 9.8 GWh | 2.8 mi |
CBEP Solar 7 | Johnstown, CO | 3.4 GWh | 2.7 mi |
Davis Battery Storage | Fort Lupton, CO | 672.0 MWh | 13 mi |
ECA CO Greeley | Greeley, CO | 78.0 MWh | 12.9 mi |
Fort St Vrain | Platteville, CO | 3.8 TWh | 5.4 mi |
Gilcrest Solar | Platteville, CO | 3.9 GWh | 3.5 mi |
Gilcrest Sun CSG | Platteville, CO | 4.5 GWh | 2.4 mi |
Gilcrest V CSG | Platteville, CO | 9.6 GWh | 3.5 mi |
Mead Battery Storage | Longmont, CO | 691.0 MWh | 8.9 mi |
NSE Camber Solar PS5 LLC (CSG) | Platteville, CO | 3.6 GWh | 4.8 mi |
NSE Camber Solar PS6 LLC CSG | Platteville, CO | 3.8 GWh | 4.1 mi |
Oak Leaf Solar XXVIII LLC (CSG) | Platteville, CO | 3.3 GWh | 6.4 mi |
Pivot Solar 4 LLC (CSG) | Platteville, CO | 3.8 GWh | 7 mi |
Pivot Solar 8 LLC (CSG) | Platteville, CO | 3.7 GWh | 6.4 mi |
Platteville Solar CSG, LLC | Platteville, CO | 3.0 GWh | 7.1 mi |
SR Mavericks | Mead, CO | 15.3 GWh | 11.9 mi |
SR Platte Solar Farm | Platteville, CO | 34.5 GWh | 12.2 mi |
Valley View Solar | Greeley, CO | 9.2 GWh | 7.5 mi |
Vasquez V CSG | Platteville, CO | 8.2 GWh | 6.3 mi |
Weld 1 Community Solar Array | Platteville, CO | 3.4 GWh | 6.5 mi |