Adams Nielson Solar
475 North Nielson Road, Lind, WA 99341Plant Summary Information
Adams Nielson Solar is ranked #3 out of 9 solar farms in Washington in terms of total annual net electricity generation.
Adams Nielson Solar generated 13.5 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Adams Nielson Solar |
|---|---|
| Utility Name | Strata Manager, LLC |
| Location | Adams County, WA |
| Initial Operation Date | November 2018 |
| Last Update | May 2026 |
| Annual Generation | 42.1 GWh |
| Annual Consumption | 162.3 k MMBtu |
| Ranked #4,400 out of 13,081 Power Plants Nationwide | |
| Ranked #1,190 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #88 out of 131 Washington Power Plants | |
| Ranked #3 out of 9 Washington Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Adams Nielson Solar, LLC (2017 to 2020) Strata Manager, LLC (2021 to 2025) |
Map of Adams Nielson Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Adams Nielson Solar.
Monthly Net Generation for Adams Nielson Solar
Monthly Plant Fuel Consumption for Adams Nielson Solar
Adams Nielson Solar Details
| Summary Information | |
|---|---|
| Plant Name | Adams Nielson Solar (61933) |
| Plant Address | 475 North Nielson Road, Lind, WA 99341 |
| Utility | Strata Manager, LLC (64778) |
| Latitude, Longitude | 46.95528, -118.62124 |
| Generation Dates on File | Nov 2018 to May 2026 |
| Initial Operation Date | November 2018 |
| Annual Generation | 42.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Avista Corporation (AVA) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Avista Corp (20169) WA |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator ADAMS Details Operating November 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 19.2 MW |
| Summer Capacity | 19.2 MW |
| Winter Capacity | 19.2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Dual Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 28 MW |
| Thin Film A Si | No |
| Thin Film CIGS | Yes |
| Other Materials | No |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Adams Nielson Solar Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Adams Nielson Solar, LLC | 800 Taylor St, Suite 200, Durham, NC 27701 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1180 | American Falls Solar | American Falls, ID | 43.6 GWh |
| #1181 | Watlington Solar | Halifax, VA | 43.6 GWh |
| #1182 | Murphy Flat Solar | Murphy, ID | 43.1 GWh |
| #1183 | Western Antelope Blue Sky Ranch A | Lancaster, CA | 43.0 GWh |
| #1184 | Westmoreland County Solar Project | WARSAW, VA | 43.0 GWh |
| #1185 | Avalon Solar II | Sahuarita, AZ | 42.9 GWh |
| #1186 | Kettleman Solar -Centaurus | Kettleman City, CA | 42.9 GWh |
| #1187 | Energix Leatherwood, LLC | Axton, VA | 42.3 GWh |
| #1188 | Temperance Solar, LLC | Erie, MI | 42.2 GWh |
| #1189 | Taos Mesa Energy Facility Hybrid | El Prado, NM | 40.7 GWh |
| #1191 | Pleasant Hill Solar | Suffolk, VA | 42.0 GWh |
| #1192 | Crooked Creek PV I | Salem, IL | 41.8 GWh |
| #1193 | Bingham Solar, LLC | St. Johns, MI | 41.8 GWh |
| #1194 | Decatur County Solar Project | Bainbridge, GA | 41.8 GWh |
| #1195 | Calverton Solar Energy Center | Calverton, NY | 41.7 GWh |
| #1196 | Bayshore Solar B, LLC | Lancaster, CA | 41.7 GWh |
| #1197 | Old Midville Solar | Millen, GA | 41.6 GWh |
| #1198 | Butler Solar Farm 20 | Butler, GA | 41.6 GWh |
| #1199 | RE Columbia Two, LLC | Mojave, CA | 41.5 GWh |
| #1200 | Arrowleaf Solar and Storage | Brawley, CA | 38.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Adams Nielson Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Columbia Generating Station | Richland, WA | 9.1 TWh | 47.5 mi |
| Eltopia Branch Canal 4.6 | Pasco, WA | 7.7 GWh | 49.9 mi |
| Hopkins Ridge Wind | Dayton, WA | 352.9 GWh | 52.5 mi |
| Horn Rapids Solar, Storage and Training | Richland, WA | 4.6 GWh | 53.3 mi |
| Ice Harbor | Burbank, WA | 1.5 TWh | 50.3 mi |
| Little Goose | Dayton, WA | 1.6 TWh | 38.1 mi |
| Lower Granite | Pomeroy, WA | 1.5 TWh | 60 mi |
| Lower Monumental | Kahlotus, WA | 1.5 TWh | 27.3 mi |
| Lower Snake River Wind Energy Project | Pomeroy, WA | 802.3 GWh | 48.2 mi |
| Main Canal Headworks | Coulee City, WA | 105.2 GWh | 55.6 mi |
| Marengo Wind Plant | Dayton, WA | 612.6 GWh | 56.7 mi |
| Palouse | Oakesdale, WA | 303.4 GWh | 60.8 mi |
| PEC Headworks | Moses Lake, WA | 17.7 GWh | 61.7 mi |
| Potholes East Canal 66.0 | Pasco, WA | 3.2 GWh | 49.9 mi |
| Quincy Chute | Quincy, WA | 32.6 GWh | 30.1 mi |
| Rattlesnake Flat | Ritzville, WA | 419.3 GWh | 2.7 mi |
| Russell D Smith | Othello, WA | 14.4 GWh | 27.6 mi |
| Summer Falls Power Plant | Coulee City, WA | 391.2 GWh | 49.2 mi |
| Tucannon River Wind Farm | Dayton, WA | 736.8 GWh | 46.4 mi |