7448 Candlewood Road
7448 Candlewood Road, Hanover, MD 21076Plant Summary Information
7448 Candlewood Road is ranked #118 out of 157 solar farms in Maryland in terms of total annual net electricity generation.
7448 Candlewood Road generated 442.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | 7448 Candlewood Road |
---|---|
Utility Name | Hartz Solar, LLC |
Location | Anne Arundel County, MD |
Initial Operation Date | April 2020 |
Last Update | Dec 2024 |
Annual Generation | 2.3 GWh |
Annual Consumption | 8.0 k MMBtu |
Ranked #10,132 out of 12,530 Power Plants Nationwide | |
Ranked #4,932 out of 6,379 Solar Power Plants Nationwide | |
Ranked #155 out of 200 Maryland Power Plants | |
Ranked #118 out of 157 Maryland Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Hartz Solar LLC (2020 to 2020) Hartz Solar, LLC (2021 to 2024) |
Map of 7448 Candlewood Road
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 7448 Candlewood Road.
Monthly Net Generation for 7448 Candlewood Road
7448 Candlewood Road Details
Summary Information | |
---|---|
Plant Name | 7448 Candlewood Road (64502) |
Plant Address | 7448 Candlewood Road, Hanover, MD 21076 |
Utility | Hartz Solar, LLC (60268) |
Latitude, Longitude | 39.16, -76.7 |
Generation Dates on File | Apr 2020 to Dec 2024 |
Initial Operation Date | April 2020 |
Annual Generation | 2.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF20-442-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | (421) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Baltimore Gas & Electric Co (1167) MD |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator 1 Details Operating April 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2020 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 222 |
Tilt Angle | 15 |
DC Net Capacity | 1.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1.9 MW |
7448 Candlewood Road Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4922 | Fremont - Kato Rd | Fremont, CA | 2.3 GWh |
#4923 | Dover CSG | Dover Plains, NY | 2.3 GWh |
#4924 | Kearsarge Wilmington | Wilmington, MA | 2.3 GWh |
#4925 | University Park Solar | State College, PA | 2.3 GWh |
#4926 | Amazon Maryland DCA1 | Sparrows Point, MD | 2.3 GWh |
#4927 | Jersey Gardens Phase 1 | Elizabeth, NJ | 2.3 GWh |
#4928 | IKEA Jacksonville Rooftop PV System | Jacksonville, FL | 2.3 GWh |
#4929 | Frederick County - Landfill | Frederick, MD | 2.3 GWh |
#4930 | Davis Solar | Goshen, NY | 2.2 GWh |
#4931 | Seaboard Sheffield, LLC | Sheffield, MA | 2.3 GWh |
#4933 | Greensburg Solar | Greensburg, KS | 2.3 GWh |
#4934 | Franklin Solar, LLC | Louisburg, NC | 2.3 GWh |
#4935 | Route 57 Solar | Agawam, MA | 2.3 GWh |
#4936 | Broadway 2 - UC Riverside | Riverside, CA | 2.3 GWh |
#4937 | USS Cosmo Solar LLC (CSG) | Danube, MN | 2.2 GWh |
#4938 | McCormick & Co. Inc. at Belcamp | Belcamp, MD | 2.2 GWh |
#4939 | 601 Doremus CDG | Newark, NJ | 2.2 GWh |
#4940 | Case Vander Eyk, Jr Dairy Solar | Pixley, CA | 2.2 GWh |
#4941 | Petit Jean | Clinton, AR | 2.2 GWh |
#4942 | USS Rosebud Solar LLC | Morgan, MN | 2.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 7448 Candlewood Road.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
6685 Santa Barbara Ct | Elkridge, MD | 1.6 GWh | 3.1 mi |
Anne Arundel County Public Schools | Pasadena, MD | 1.8 GWh | 10.9 mi |
Bowie State Solar | Bowie, MD | 373.0 MWh | 10.2 mi |
Brandon Shores | Baltimore, MD | 2.6 TWh | 8.9 mi |
CCBC-Catonsville | Catonsville, MD | 2.5 GWh | 6.7 mi |
CPG - Duke 5300A Holabird | Baltimore, MD | 2.4 GWh | 11.1 mi |
CPG - Duke 5300B Holabird | Baltimore, MD | 2.4 GWh | 11 mi |
CPG - Duke 5900 Holabird | Baltimore, MD | 2.1 GWh | 11.4 mi |
CPG - Duke 6000 Holabird | Baltimore, MD | 2.2 GWh | 11.4 mi |
Domino Sugar Baltimore | Baltimore, MD | 56.3 GWh | 9.7 mi |
Herbert A Wagner | Baltimore, MD | 198.8 GWh | 9.4 mi |
Hollins Ferry CSG | Halethorpe, MD | 2.4 GWh | 4.6 mi |
IGS Solar I - BWI2 | Baltimore, MD | 2.5 GWh | 11 mi |
IGS Solar I - BWI5 | Baltimore, MD | 2.0 GWh | 11.1 mi |
Maryland Bioenergy Center (Jessup) | Jessup, MD | 1.9 GWh | 4.3 mi |
MD JESSUP 7950 OCEANO AVE | Jessup, MD | 623.0 MWh | 4.7 mi |
Millersville LFG | Severn, MD | 18.4 GWh | 5.4 mi |
Philadelphia | Baltimore, MD | 4.9 GWh | 12 mi |
Snowden River CSG | Columbia, MD | 3.2 GWh | 7.4 mi |
Wheelabrator Baltimore Refuse | Baltimore, MD | 299.5 GWh | 8.2 mi |