CPV Saddleback Ridge Wind, LLC

8403 Colesville Road, Suite 91 Silver Spring, MD 20910

Company Summary Information

CPV Saddleback Ridge Wind, LLC is ranked #1,843 out of 5,094 utilities nationwide in terms of total annual net electricity generation, and they are ranked #498 out of 733 utilities in terms of total annual net electricity generation from wind.

CPV Saddleback Ridge Wind, LLC generated 32.0 GWh during the 3-month period between September 2024 to December 2024.

According to FERC EQR data, CPV Saddleback Ridge Wind, LLC had a total of $2.5M in seller transasctions in 2025 Q2.

Company NameCPV Saddleback Ridge Wind, LLC
Location8403 Colesville Road, Suite 91 Silver Spring, MD 20910
EIA Utility TypeIndependent Power Producer
EIA Utility DatesJan 2015 to Dec 2024
EIA Annual Generation 89.5 GWh
EIA Power Plants1
Fuel Types Wind
Ranked #1,843 out of 5,094 Utilities Nationwide by Annual Generation
Ranked #498 out of 733 Utilities Nationwide in terms of Wind Generation

FERC Seller Summary

Seller Dates AvailableApr 2023 to Sep 2025
Seller Total Transaction Charges$20.33M
Seller Total Transactions267
Seller 2025 Q2 Transaction Charges$2.53M
Seller 2025 Q2 Transactions22

Map of CPV Saddleback Ridge Wind, LLC Locations

Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CPV Saddleback Ridge Wind, LLC.

Create Your Account Today

Monthly Electricity Generation by Type

Monthly electricity generation by source as reported by the EIA

15k15k12k12k9k9k6k6k3k3k0020152015201620162017201720182018201920192020202020212021202220222023202320242024
Download SVG
Download PNG
Download CSV

Monthly FERC Transaction Charges by Type

Monthly aggregates and sums are derived from FERC Electronic Quarterly Reports (EQR)

Power Plants Operated by CPV Saddleback Ridge Wind, LLC

PlantLocationAnnual GenerationInitial Operation DateLast UpdateFuel Types
Saddleback Ridge Wind FarmCarthage, Maine83 GWhNov 2014Dec 2024 Wind

Other Companies Listed Alphabetically

A list of companies close to CPV Saddleback Ridge Wind, LLC when arranged alphabetically. They do not neccessarily have any association with CPV Saddleback Ridge Wind, LLC.

Company NameCompany LocationEIA Annual
Generation
FERC 2025 Q2
Transactions
CPN Bethpage 3RD Turbine, Inc.Houston, TX-$1.42M
CPRE 1 Lessee, LLCCharlotte, NC-$1.96M
CPV Backbone Solar, LLCSilver Spring, MD-$174.10k
CPV Beaver Ridge Wind LLC11.3 GWh-
CPV Canton Mountain Wind LLCSilver Spring, MD55.1 GWh$1.66M
CPV Fairview, LLCWhite Plains, NY8.5 TWh$84.75M
CPV Keenan II Renewable Energy Co LLCSilver Spring, MD284.6 GWh$6.54M
CPV Maple Hill Solar, LLCSilver Spring, MD173.9 GWh$2.25M
CPV Maryland LLCSilver Spring, MD4.5 TWh$72.31M
CPV Retail Energy LPSilver Spring, MD-$27.20M
CPV Shore, LLCSilver Spring, MD-$40.19M
CPV Spruce Mountain Wind LLC58.7 GWh-
CPV Stagecoach Solar, LLCSilver Spring, MD187.8 GWh$2.01M
CPV Three Rivers, LLCSilver Spring, MD7.1 TWh$57.17M
CPV Towantic, LLCBraintree, MA5.6 TWh$57.37M
CPV Valley, LLCLOS Angeles, CA5.5 TWh$56.79M
CR Clearing, LLCBaltimore, MD195.2 GWh$2.04M
Cranberry Highway Solar, LLCChicago, IL2.4 GWh-
Cranberry Point Energy Storage LLCThe Woodlands, TX-5.1 GWh$2.71M
Crane Garden LLCMinneapolis, MN2.2 GWh-

All Companies Associated with CPV Saddleback Ridge Wind, LLC

A list of all companies associated with CPV Saddleback Ridge Wind, LLC in terms of FERC EQR transactions. Total Transaction Charges are based on FERC EQR data obtained since Q3 2013.

Company Name2025 Q2 Transactions w/
CPV Saddleback Ridge Wind, LLC
ISO New England Inc.$398.18k
Reading Municipal Light Department$323.45k
Braintree Electric Light Department$224.60k
Norwood Municipal Light Department$198.76k
Danvers Electric Division$198.38k
Littleton Electric Light & Water$154.94k
Middleborough Gas And Electric Department$149.41k
Wellesley Municipal Light Plant$145.03k
North Attleborough Electric Department$143.18k
Hingham Municipal Lighting Plant$120.51k
Concord Municipal Light Plant$109.96k
Massachusetts Development Finance Agency$83.83k
Belmont Municipal Light Department$79.35k
Middleton Municipal Light Department$59.03k
Stowe Electric Department$46.37k
Georgetown Municipal Light Department$30.55k
Rowley Municipal Lighting Plant$26.49k
Groveland Electric Light Department$22.69k
Merrimac Municipal Light Plant$18.21k

Company Contacts

A list of all company contacts obtained from FERC EQR data since 2013

ContactTitlePhoneEmailAddressFERC Filing Periods
Generation Management Analyst2023Q3 - 2025Q3
Manager of Commodity Settlements2023Q2 - 2025Q3
Generation Management Analyst2023Q2 - 2023Q2

The 20 Most Recent FERC EQR Transactions

Displaying Results 1 to 20 of 267   ( 0.017s )
Seller NameBuyer NameProductTransaction
Group Ref #
Begin DateEnd DateTrade DateQuantityPriceUnitsTransmission
Charge
Transaction
Charge
FERC Tariff RefContract
Service
Agreement
Contract
Filing
Type
Contract
Execution
Date
Contract
Commencement
Date
Contract
Termination
Date
TimezoneBalancing
Authority
Point of
Delivery Hub
ClassTermIncrementIncrement
Peaking
Filing
Type
Broker
Exchange
CPV Saddleback Ridge Wind, LLCReading Municipal Light DepartmentENERGYT332025-09-16 23:592025-09-30 23:592013-11-18413.019$95.00$/MWH$0.00$39,236.82Original Volume No. 1RMLD_SRW_11182013New2013-11-182014-09-142035-09-14EasternDaylight2ISNE38173NotApplicableClassLongTermYearlyFullPeriodNew
CPV Saddleback Ridge Wind, LLCRowley Municipal Lighting PlaENERGYT342025-09-16 23:592025-09-30 23:592013-11-1833.828$95.00$/MWH$0.00$3,213.63Original Volume No. 1RMLP_SRW_11182013New2013-11-182014-09-142035-09-14EasternDaylight2ISNE38173NotApplicableClassLongTermYearlyFullPeriodNew
CPV Saddleback Ridge Wind, LLCBraintree Electric Light DeparENERGYT202025-09-16 23:592025-09-30 23:592013-11-18286.786$95.00$/MWH$0.00$27,244.62Original Volume No. 1BELD_SRW_11182013New2013-11-182014-09-142035-09-14EasternDaylight2ISNE38173NotApplicableClassLongTermYearlyFullPeriodNew
CPV Saddleback Ridge Wind, LLCMassachusetts Development FinaENERGYT272025-09-16 23:592025-09-30 23:592013-11-18107.044$95.00$/MWH$0.00$10,169.15Original Volume No. 1MDFA_SRW_11182013New2013-11-182014-09-142035-09-14EasternDaylight2ISNE38173NotApplicableClassLongTermYearlyFullPeriodNew

CPV Saddleback Ridge Wind, LLC Name and Address Permutations

Due to the nature of the data we have to make some assumptions when determining if two companies are the same. So to be transparent about how we're calculating some of the summary values, here are all the company names and addresses that were combined to create this record. While we try to make sure everything is as accurate as possible we can't guarantee complete accuracy for all records.

Company NameCompany Address
CPV Saddleback Ridge Wind, LLC8402 Colesville RD, Suite 915 Silver Spring, MD 20909
CPV Saddleback Ridge Wind, LLC8403 Colesville RD, Suite 915 Silver Spring, MD 20910
CPV Saddleback Ridge Wind, LLC8403 Colesville Road, Suite 91 Silver Spring, MD 20910