UADA
220 and 155 Sunnyside Drive, Nashville, AR 71852Plant Summary Information
UADA is ranked #24 out of 66 solar farms in Arkansas in terms of total annual net electricity generation.
UADA generated 1.0 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | UADA |
|---|---|
| Utility Name | Entegrity Solar UA AG, LLC |
| Location | Howard County, AR |
| Initial Operation Date | May 2023 |
| Last Update | Dec 2024 |
| Annual Generation | 5.9 GWh |
| Annual Consumption | 20.1 k MMBtu |
| Ranked #7,691 out of 12,553 Power Plants Nationwide | |
| Ranked #2,956 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #67 out of 112 Arkansas Power Plants | |
| Ranked #24 out of 66 Arkansas Solar Power Plants | |
| Fuel Types | Solar |
Map of UADA
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for UADA.
Monthly Net Generation for UADA
UADA Details
| Summary Information | |
|---|---|
| Plant Name | UADA (67526) |
| Plant Address | 220 and 155 Sunnyside Drive, Nashville, AR 71852 |
| Utility | Entegrity Solar UA AG, LLC (66248) |
| Latitude, Longitude | 33.92658, -93.85887 |
| Generation Dates on File | Jan 2024 to Dec 2024 |
| Initial Operation Date | May 2023 |
| Annual Generation | 5.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 23-346-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southwestern Electric Power Co (17698) AR |
| Grid Voltage | 12.50 kV |
| Energy Storage | No |
Generator 62293 Details Operating May 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2.8 MW |
| Summer Capacity | 2.8 MW |
| Winter Capacity | 2.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 3.7 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | Yes |
| Virtual Net Metering Agreement | Yes |
| Virtual Net Metering DC Capacity | 3.7 MW |
UADA Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2946 | Springfield Solar PV | Springfield, MA | 5.9 GWh |
| #2947 | Pine Island Solar CSG | Pine Island, MN | 5.9 GWh |
| #2948 | Summit - Lysander (CSG) | Lysander, NY | 5.9 GWh |
| #2949 | Baltimore Church Solar, LLC | Fairmont, NC | 5.9 GWh |
| #2950 | TWE Chocowinity Solar, LLC | Chocowinity, NC | 5.9 GWh |
| #2951 | Bird Machine Solar Farm | South Walpole, MA | 5.9 GWh |
| #2952 | 1009 Yadkin Solar | Yadkinville, NC | 5.9 GWh |
| #2953 | Waterloo Solar (IA) | Waterloo, IA | 5.9 GWh |
| #2954 | Freetown Solar | Freetown, MA | 5.9 GWh |
| #2955 | Lemonweir (Oak 1) | Mauston, WI | 5.9 GWh |
| #2957 | Dalton 2 | Dalton, GA | 5.9 GWh |
| #2958 | Cuba 2.5ac, LLC | Cuba, NM | 5.9 GWh |
| #2959 | Palmer | Palmer, MA | 5.9 GWh |
| #2960 | BWC Rams Horn Channel LLC | Beverly, MA | 5.9 GWh |
| #2961 | Buckhorn Solar Plant | Paragonah, UT | 5.9 GWh |
| #2962 | Webb Road Solar | Waterville, ME | 5.9 GWh |
| #2963 | Blackhorse Farm Solar, LLC CSG | Warren, RI | 5.9 GWh |
| #2964 | WrightSun CSG, LLC | St. Michael, MN | 5.9 GWh |
| #2965 | Stanford Campus Solar | Stanford, CA | 5.9 GWh |
| #2966 | Kinsley II Landfill Solar System | Sewell, NJ | 5.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding UADA.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ACC | Searcy, AR | 4.2 GWh | 0.1 mi |
| Ashdown | Ashdown, AR | 585.5 GWh | 24.3 mi |
| Blakely Mountain | Royal, AR | 158.1 GWh | 58.5 mi |
| Broken Bow Dam | Broken Bow, OK | 108.9 GWh | 49.5 mi |
| Carpenter | Hot Springs, AR | 102.4 GWh | 59.5 mi |
| Degray | Arkadelphia, AR | 214.3 GWh | 47.1 mi |
| Fulton (AR) | Fulton, AR | 194.4 GWh | 22.2 mi |
| Hot Spring Generating Facility | Malvern, AR | 2.4 TWh | 62.2 mi |
| Hot Springs 2020 | Hot Springs, AR | 1.5 GWh | 51.1 mi |
| International Paper Texarkana Mill | Queen City, TX | 336.7 GWh | 47.9 mi |
| John W Turk Jr Power Plant | Fulton, AR | 2.7 TWh | 19.3 mi |
| Lake Catherine | Jones Mill, AR | 299.6 GWh | 64.8 mi |
| Magnet Cove | Malvern, AR | 3.7 TWh | 68.2 mi |
| McClellan (AR) | Camden, AR | 43.3 GWh | 66.2 mi |
| Remmel | Malvern, AR | 30.4 GWh | 65.1 mi |
| Rich Mountain Electric Cooperative | Mena, AR | 2.0 GWh | 49.6 mi |
| SAU Tech | Bearden, AR | 1.9 GWh | 67.5 mi |
| South Central Electric Cooperative | Arkadelphia, AR | 2.1 GWh | 47.1 mi |
| Southwest Arkansas Electric | Texarkana, AR | 2.2 GWh | 29.8 mi |
| Veolia (Gum Springs) | Arkadelphia, AR | 2.7 GWh | 45.2 mi |