SLO-3 Community Solar
6885 El Centro Blvd, Las Cruces, NM 88012Plant Summary Information
SLO-3 Community Solar is ranked #96 out of 96 solar farms in New Mexico in terms of total annual net electricity generation.
SLO-3 Community Solar generated 55.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | SLO-3 Community Solar |
|---|---|
| Utility Name | Affordable Solar Silver City, LLC |
| Location | Doña Ana County, NM |
| Initial Operation Date | December 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 55.0 MWh |
| Annual Consumption | 188 MMBtu |
| Ranked #12,818 out of 13,081 Power Plants Nationwide | |
| Ranked #6,984 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #151 out of 152 New Mexico Power Plants | |
| Ranked #96 out of 96 New Mexico Solar Power Plants | |
| Fuel Types | Solar |
Map of SLO-3 Community Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SLO-3 Community Solar.
Monthly Net Generation for SLO-3 Community Solar
Monthly Plant Fuel Consumption for SLO-3 Community Solar
SLO-3 Community Solar Details
| Summary Information | |
|---|---|
| Plant Name | SLO-3 Community Solar (69106) |
| Plant Address | 6885 El Centro Blvd, Las Cruces, NM 88012 |
| Utility | Affordable Solar Silver City, LLC (58509) |
| Latitude, Longitude | 32.433, -106.68617 |
| Generation Dates on File | Dec 2025 to Dec 2025 |
| Initial Operation Date | December 2025 |
| Annual Generation | 55.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | El Paso Electric Company (EPE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | El Paso Electric Co (5701) NM |
| Grid Voltage | 23.90 kV |
| Energy Storage | No |
Generator SLO-3 Details Operating December 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Summer Capacity | 5 MW |
| Winter Capacity | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 7.8 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | Yes |
| Virtual Net Metering DC Capacity | 7.8 MW |
SLO-3 Community Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6974 | Union Solar LLC | Union, NJ | 81.0 MWh |
| #6975 | Beaver Solar LLC | Beaver, PA | 73.0 MWh |
| #6976 | Acer | Madrid, NY | 68.0 MWh |
| #6977 | Solvita | Kettering, OH | 67.0 MWh |
| #6978 | Little Cedar | Little Cedar, IA | 65.0 MWh |
| #6979 | Viola | Webster, WI | 65.0 MWh |
| #6980 | IL Joliet 1101 Cherry Hl Rd | Joliet, IL | 64.0 MWh |
| #6981 | Bishop Ranch - BR 15-DD | San Ramon, CA | 62.0 MWh |
| #6982 | Frederick County - Landfill | Frederick, MD | 60.0 MWh |
| #6983 | Novel Stumpf 1 Solar CSG | Red Wing, MN | 60.0 MWh |
| #6985 | Novel Brock Solar LLC CSG | Clarkfield, MN | 54.0 MWh |
| #6986 | Hobart Solar, LLC | Hobart, IN | 49.0 MWh |
| #6987 | BMW Manufacturing Co | Greer, SC | 12.2 GWh |
| #6988 | Oak Leaf Solar XVII Community Solar | Pittsfield, MA | 47.0 MWh |
| #6989 | Pekin Community High School | Pekin, IL | 42.6 MWh |
| #6990 | SR Albany, LLC | Greenville, TN | 41.0 MWh |
| #6991 | Uniqlo NJ CS Ph 2 CSG | Philipsburg, NJ | 39.0 MWh |
| #6992 | 10601 Seymour Ave East 2 CSG | Franklin Park, IL | 39.0 MWh |
| #6993 | SR Lexington | Lexington, TN | 38.0 MWh |
| #6994 | Buckheart Creek Solar I Community Solar | Canton, IL | 37.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SLO-3 Community Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Afton Generating Station | La Mesa, NM | 483.6 GWh | 23.9 mi |
| Alta Luna | Deming, NM | 15.8 GWh | 47.6 mi |
| Buena Vista Energy Center | Chaparral, NM | 382.8 GWh | 34.5 mi |
| Fort Bliss (DEA EPIC) | El Paso, TX | 4.6 GWh | 45.5 mi |
| Hatch Solar Energy Center I, LLC | Hatch, NM | 9.8 GWh | 36.1 mi |
| Holloman Solar Facility | Holloman Air Force Ba, NM | 4.3 GWh | 49.1 mi |
| Macho Springs | Deming, NM | 124.2 GWh | 47.2 mi |
| Macho Springs Power I | Deming, NM | 115.3 GWh | 48.7 mi |
| Milagro Solar I | Santa Teresa, NM | 311.9 GWh | 44.1 mi |
| New Mexico State University | Las Cruces, NM | 28.0 GWh | 23.1 mi |
| Newman | El Paso, TX | 3.5 TWh | 34.4 mi |
| Newman Solar | El Paso, TX | 15.8 GWh | 34.9 mi |
| NMSU Solar and Storage | Las Cruces, NM | 7.8 GWh | 10.7 mi |
| Nodal Power | Sunland Park, NM | 11.4 GWh | 43.3 mi |
| Phelps Dodge Refining | El Paso, TX | 59.2 GWh | 49.3 mi |
| Rio Grande | SunLand Park, NM | 925.9 GWh | 44.2 mi |
| Roadrunner Solar | Santa Teresa, NM | 47.0 GWh | 44.2 mi |
| SunE EPE1 LLC | Chaparral, NM | 26.2 GWh | 34.1 mi |
| SunE EPE2 LLC | Las Cruces, NM | 26.4 GWh | 18.2 mi |
| TJX 2021 DG El Paso DC | El Paso, TX | 1.3 GWh | 47.8 mi |