Dynamic - Gray Solar

51 Yarmouth Road, Gray, ME 4039

Plant Summary Information

Dynamic - Gray Solar is ranked #92 out of 145 solar farms in Maine in terms of total annual net electricity generation.

Dynamic - Gray Solar generated 1.2 GWh during the 3-month period between September 2025 to December 2025.

Plant NameDynamic - Gray Solar
Utility NameAltus Power America Management, LLC
LocationCumberland County, ME
Initial Operation DateDecember 2024
Last Update Dec 2025
Annual Generation 5.2 GWh
Annual Consumption 17.6 k MMBtu
Ranked #8,169 out of 13,081 Power Plants Nationwide
Ranked #3,463 out of 7,015 Solar Power Plants Nationwide
Ranked #171 out of 236 Maine Power Plants
Ranked #92 out of 145 Maine Solar Power Plants
Fuel Types Solar
Previous Operator MN8 Energy LLC (2023 to 2023)
Altus Power America Management, LLC (2024 to 2025)

Map of Dynamic - Gray Solar

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dynamic - Gray Solar.

Create Your Account Today

Monthly Net Generation for Dynamic - Gray Solar

Monthly Plant Fuel Consumption for Dynamic - Gray Solar

Dynamic - Gray Solar Details

Summary Information
Plant NameDynamic - Gray Solar (67014)
Plant Address51 Yarmouth Road, Gray, ME 4039
UtilityAltus Power America Management, LLC (60281)
Latitude, Longitude43.89244, -70.317
Generation Dates on FileJan 2025 to Dec 2025
Initial Operation DateDecember 2024
Annual Generation 5.2 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket NumberTBD
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionNPCC
Balancing AuthorityISO New England Inc. (ISNE)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerCentral Maine Power Co (3266) ME
Grid Voltage 12.50 kV
Energy StorageNo

Generator GEN1 Details Operating December 2024

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity4.9 MW
Nameplate Power Factor1
Summer Capacity4.9 MW
Winter Capacity4.9 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2024
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Fixed TiltNo
Azimuth Angle180
DC Net Capacity7 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity7 MW

Dynamic - Gray Solar Plant Owners

Owner NameAddressOwnership
Gray Yarmouth Road Solar LLC750 Park of Commerce Blvd, Boca Raton, FL 33487100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3453Hanford 1 and 2Hanford, CA5.2 GWh
#3454Meriwether JacksonMachester, GA5.2 GWh
#3455Putnam Erikson 2Eatonton, GA5.2 GWh
#3456Silveira Ranch Road SolarNovato, CA5.2 GWh
#3457Leicester One MA Solar LLCLeicester, MA5.2 GWh
#3458Mapleton Community SolarMapleton, MN5.2 GWh
#3459Kearsarge Amesbury HybridAmesbury, MA5.0 GWh
#3460Croton SolarCortlandt, NY5.2 GWh
#3461ArcadiaNewark, NY5.2 GWh
#34624OaksFour Oaks, NC5.2 GWh
#3464StanfordStanfordville, NY5.2 GWh
#3465UMASSAmherst, MA5.2 GWh
#3466DEC Phase II at GeorgetownGeorgetown, DE5.2 GWh
#3467Calpine Vineland Solar LLCVineland, NJ5.1 GWh
#3468EDF LancasterLancaster, MA5.1 GWh
#3469Morin Solar 2013 LLCWarren, MA5.1 GWh
#3470ENGIE 2019 ProjectCo-MA1, LLCAgawam, MA5.1 GWh
#3471Burgaw Solar, LLCBurgaw, NC5.1 GWh
#3472Conetoe SolarTarboro, NC5.1 GWh
#3473CA - DGS RFP - RJ Donovan State PrisonSan Diego, CA5.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Dynamic - Gray Solar.

Plant NamePlant LocationAnnual GenerationDistance
Barker LowerAuburn, ME3.8 GWh14.1 mi
Charles E MontyLewiston, ME114.4 GWh15.1 mi
Lewiston Junction Road SolarPoland, ME6.8 GWh10.9 mi
Lisbon Street SolarLewiston, ME2.7 GWh14.2 mi
MD - EDFR - Phase II - LewistonLewiston, ME7.7 GWh15.4 mi
Mechanic FallsMechanic Falls, ME1.9 GWh15.6 mi
MMWAC Resource Recovery FacilityAuburn, ME7.8 GWh12.4 mi
NaplesNaples, ME3.0 GWh14 mi
North GorhamGorham, ME6.5 GWh9.1 mi
Pejepscot Hydroelectric ProjectTopsham, ME49.7 GWh15.2 mi
Regional Waste SystemsPortland, ME87.1 GWh16.4 mi
Roosevelt TrailWindham, ME1.4 GWh7.5 mi
S D Warren WestbrookWestbrook, ME15.0 GWh14.5 mi
Sabattus SB01Sabattus, ME7.7 GWh16 mi
ShakerGray, ME6.2 GWh1.3 mi
SP-339 Mechanic FallsMechanic Falls, ME1.4 GWh14.9 mi
StandishStandish, ME7.3 GWh15 mi
Upper BarkerAuburn, ME4.0 GWh14.1 mi
William F Wyman HybridYarmouth, ME338.6 GWh12.6 mi
Worumbo Hydro StationLisbon Falls, ME74.3 GWh14.5 mi