Croda Atlas Point CHP
315 Cherry Lane, New Castle, DE 19720Plant Summary Information
Croda Atlas Point CHP is ranked #16 out of 34 power plants in Delaware in terms of total annual net electricity generation.
Croda Atlas Point CHP is comprised of 3 generators and generated 2.0 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Croda Atlas Point CHP |
|---|---|
| Utility Name | Croda Inc. |
| Location | New Castle County, DE |
| Initial Operation Date | August 2013 |
| Last Update | Dec 2025 |
| Annual Generation | 8.1 GWh |
| Annual Consumption | 96.7 k MMBtu |
| Ranked #6,934 out of 13,081 Power Plants Nationwide | |
| Ranked #215 out of 281 Landfill Gas Power Plants Nationwide | |
| Ranked #16 out of 34 Delaware Power Plants | |
| Ranked #3 out of 3 Delaware Landfill Gas Power Plants | |
| Fuel Types | Landfill Gas |
Map of Croda Atlas Point CHP
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Croda Atlas Point CHP.
Monthly Net Generation for Croda Atlas Point CHP
Monthly Plant Fuel Consumption for Croda Atlas Point CHP
Croda Atlas Point CHP Details
| Summary Information | |
|---|---|
| Plant Name | Croda Atlas Point CHP (59783) |
| Plant Address | 315 Cherry Lane, New Castle, DE 19720 |
| Utility | Croda Inc. (59550) |
| Latitude, Longitude | 39.69333, -75.54306 |
| Generation Dates on File | Jan 2014 to Dec 2025 |
| Initial Operation Date | August 2013 |
| Annual Generation | 8.1 GWh |
| Fuel Types | Landfill Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Chemical Manufacturing (325) |
| Sector | Industrial CHP (7) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Delmarva Power (5027) DE |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator 91197 Details Operating August 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.1 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 1.1 MW |
| Winter Capacity | 1.1 MW |
| Minimum Load | 0.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2013 |
|---|---|
| Planned Retirement | August 2033 |
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 91198 Details Operating August 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.1 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 1.1 MW |
| Winter Capacity | 1.1 MW |
| Minimum Load | 0.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2013 |
|---|---|
| Planned Retirement | August 2033 |
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Landfill Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 91199 Details Operating June 2021
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Minimum Load | 1.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2021 |
|---|---|
| Planned Retirement | August 2033 |
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Croda Atlas Point CHP Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #205 | White Street Renewables | Greensboro, NC | 15.6 GWh |
| #206 | Decatur-Morgan Co LFG Recovery Project | Trinity, AL | 9.3 GWh |
| #207 | Santa Cruz Energy | Santa Cruz, CA | 9.2 GWh |
| #208 | Waste Management Piedmont LFGTE Project | Kernersville, NC | 9.0 GWh |
| #209 | Nelson Gardens Landfill Gas to Energy | San Antonio, TX | 8.8 GWh |
| #210 | Waste Management Northern Oaks LFGTE | Harrison, MI | 8.7 GWh |
| #211 | Norther Tier Landfill | Burlington, PA | 8.5 GWh |
| #212 | Glades Pike Generation Plant | Somerset, PA | 8.4 GWh |
| #213 | COC Surry LFG, LLC | Mount Airy, NC | 8.3 GWh |
| #214 | Hill AFB LFG Facility, Bldg #737 | Hill AFB, UT | 8.2 GWh |
| #216 | Grand River | Grand Ledge, MI | 7.9 GWh |
| #217 | Morgantown | Morgantown, PA | 7.9 GWh |
| #218 | Richmond Energy | Henrico, VA | 7.8 GWh |
| #219 | Bi-County Gas Producers | Woodlawn, TN | 7.3 GWh |
| #220 | St Joseph Landfill Generating Station | St Joseph, MO | 7.0 GWh |
| #221 | New Bern | New Bern, NC | 7.2 GWh |
| #222 | MM Taunton Energy | Taunton, MA | 6.9 GWh |
| #223 | MM Albany Energy | Albany, NY | 6.8 GWh |
| #224 | New River Clean Energy | Beckley, WV | 6.8 GWh |
| #225 | Morehead Generating Facility | Morehead, KY | 6.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Croda Atlas Point CHP.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AGT001 Centerville Fuel Cell | Wilmington, DE | 10.1 GWh | 6.1 mi |
| AstraZeneca Newark Solar | Newark, DE | 5.3 GWh | 9.2 mi |
| Bridgeport Disposal Solar Farm | Gloucester, NJ | 1.6 GWh | 12.1 mi |
| Brookside Newark | Newark, DE | 20.5 GWh | 9.4 mi |
| Chester Generating Station | Chester, PA | 944.0 MWh | 12.7 mi |
| Chester Operations | Chester, PA | 172.2 GWh | 14.3 mi |
| Christiana | Wilmington, DE | 767.0 MWh | 2.6 mi |
| Covanta Delaware Valley | Chester, PA | 565.3 GWh | 12.3 mi |
| DD Hay Road Solar 23 LLC | New Castle, DE | 320.0 MWh | 3.4 mi |
| Delaware City Plant | Delaware City, DE | 1.1 TWh | 8.8 mi |
| Edge Moor | Wilmington, DE | 391.3 GWh | 3.8 mi |
| Hay Road | Wilmington, DE | 2.4 TWh | 4 mi |
| Longwood Gardens | Kennett Square, PA | 1.8 GWh | 13.7 mi |
| Marcus Hook Energy LP | Marcus Hook, PA | 5.9 TWh | 10.2 mi |
| MD - WL Gore - Appleton | Elkton, MD | 1.7 GWh | 14.4 mi |
| Pilesgrove | Pilesgrove, NJ | 12.1 GWh | 13.6 mi |
| Red Lion Energy Center | New Castle, DE | 201.7 GWh | 7.4 mi |
| South Campus Solar | Wilmington, DE | 2.0 GWh | 6.1 mi |
| West Station (DE) | Wilmington, DE | 322.0 MWh | 5.2 mi |
| WHA Southbridge Solar Park CSG | Wilmington, DE | 1.5 GWh | 2.1 mi |