Crisp Plant
961 Powerdam Road, Warwick, GA 31796Plant Summary Information
Crisp Plant is ranked #43 out of 46 natural gas power plants in Georgia in terms of total annual net electricity generation.
Crisp Plant is comprised of 3 generators and generated 54.6 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Crisp Plant |
|---|---|
| Utility Name | Crisp County Power Comm |
| Location | Worth County, GA |
| Initial Operation Date | May 1957 |
| Last Update | Dec 2024 |
| Annual Generation | 229.0 MWh |
| Annual Consumption | 4.2 k MMBtu |
| Ranked #11,900 out of 12,539 Power Plants Nationwide | |
| Ranked #2,051 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #245 out of 251 Georgia Power Plants | |
| Ranked #43 out of 46 Georgia Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Crisp Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Crisp Plant.
Monthly Net Generation for Crisp Plant
Crisp Plant Details
| Summary Information | |
|---|---|
| Plant Name | Crisp Plant (753) |
| Plant Address | 961 Powerdam Road, Warwick, GA 31796 |
| Utility | Crisp County Power Comm (4538) |
| Latitude, Longitude | 31.84471, -83.94073 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | May 1957 |
| Annual Generation | 229.0 MWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Lake Blackshear |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Crisp County Power Comm (4538) GA |
| Grid Voltage | 46.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | CORDELE NATURAL GAS SYSTEM CITY OF |
| Natural Gas Storage | No |
Generator GT1 Details Operating May 1957
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 4 MW |
| Winter Capacity | 4 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1957 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 1 Details Operating June 1957
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 12.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1957 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Bituminous Coal |
|---|---|
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Pulverized Coal Technology | No |
| Subcritical Technology | No |
| Supercritical Technology | No |
| Ultrasupercritical Technology | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GT2 Details Operating June 2023
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 5 MW |
| Winter Capacity | 5 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2023 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Crisp Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2041 | WAL896 | Grand Prairie, TX | 240.0 MWh |
| #2042 | WAL1062 | Friendswood, TX | 237.0 MWh |
| #2043 | WAL1232 | Belton, TX | 237.0 MWh |
| #2044 | WAL5316 | Saginaw, TX | 236.0 MWh |
| #2045 | LabCorp Engine | Raritan, NJ | 235.0 MWh |
| #2046 | WAL5764 | Fort Worth, TX | 235.0 MWh |
| #2047 | HEB00070 | Abilene, TX | 231.0 MWh |
| #2048 | WAL3584 | Houston, TX | 230.0 MWh |
| #2049 | WAL5612 | Houston, TX | 230.0 MWh |
| #2050 | Martinsville LFG Generator | Martinsville, VA | 229.0 MWh |
| #2052 | WAL3773 | Fort Worth, TX | 227.0 MWh |
| #2053 | WAL5287 | Spring, TX | 226.0 MWh |
| #2054 | Albany Green Energy | Albany, GA | 188.9 GWh |
| #2055 | WAL4509 | Tarrant, TX | 225.0 MWh |
| #2056 | WAL3827 | Richmond, TX | 224.0 MWh |
| #2057 | WAL602 | Spring, TX | 223.0 MWh |
| #2058 | WAL5080 | Hurst, TX | 223.0 MWh |
| #2059 | HEB00028 | League City, TX | 223.0 MWh |
| #2060 | Pratt 2 | Pratt, KS | 372.0 MWh |
| #2061 | Triton East and West Cogen | River Grove, IL | 218.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Crisp Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Albany Green Energy | Albany, GA | 188.9 GWh | 22.3 mi |
| Baconton Power Plant | Baconton, GA | 74.0 GWh | 32.7 mi |
| Brady Solar LLC | Americus, GA | 3.2 GWh | 21.2 mi |
| CPV Stagecoach Solar | Andersonville, GA | 171.2 GWh | 25.5 mi |
| Dougherty County Solar, LLC | Albany, GA | 269.7 GWh | 23.8 mi |
| Flint River | Albany, GA | 34.7 GWh | 20.3 mi |
| Flint River Operations | Oglethorpe, GA | 433.9 GWh | 29.3 mi |
| Freeman Avenue | Andersonville, GA | 3.0 GWh | 26.3 mi |
| Inst and Envir Dir Marine Logistics Base | Albany, GA | 3.9 GWh | 21.4 mi |
| Lake Blackshear Project | Warwick, GA | 36.3 GWh | 0.2 mi |
| Marine Corps Logistics Base Solar | Albany, GA | 55.4 GWh | 21.6 mi |
| McCleskey Cotton | Dawson, GA | 3.2 GWh | 26.1 mi |
| MCLB Landfill Gas to Energy | Albany, GA | 3.9 GWh | 21.9 mi |
| Sowega Power | Baconton, GA | 53.4 GWh | 32.7 mi |
| SR DeSoto I, LLC | DeSoto, GA | 311.4 GWh | 5.6 mi |
| SR DeSoto II | DeSoto, GA | 152.4 GWh | 5.9 mi |
| SR DeSoto III | DeSoto, GA | 130.8 GWh | 4.3 mi |
| SR Terrell | Dawson, GA | 173.3 GWh | 24.8 mi |
| Terrell Riles Stovall | Dawson, GA | 3.7 GWh | 30.1 mi |
| Tift Boyd | Tifton, GA | 6.9 GWh | 34.4 mi |