Burns Solar One LLC
715 Westminster Pike, Reisterstown, MD 21136Plant Summary Information
Burns Solar One LLC is ranked #40 out of 154 solar farms in Maryland in terms of total annual net electricity generation.
Burns Solar One LLC generated 847.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Burns Solar One LLC |
---|---|
Utility Name | Nautilus Solar Solutions |
Location | Baltimore County, MD |
Initial Operation Date | December 2020 |
Last Update | Dec 2024 |
Annual Generation | 3.9 GWh |
Annual Consumption | 13.7 k MMBtu |
Ranked #8,538 out of 12,288 Power Plants Nationwide | |
Ranked #3,564 out of 6,174 Solar Power Plants Nationwide | |
Ranked #71 out of 195 Maryland Power Plants | |
Ranked #40 out of 154 Maryland Solar Power Plants | |
Fuel Types | Solar |
Map of Burns Solar One LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Burns Solar One LLC.
Monthly Net Generation for Burns Solar One LLC
Burns Solar One LLC Details
Summary Information | |
---|---|
Plant Name | Burns Solar One LLC (64606) |
Plant Address | 715 Westminster Pike, Reisterstown, MD 21136 |
Utility | Nautilus Solar Solutions (61227) |
Latitude, Longitude | 39.47653, -76.85446 |
Generation Dates on File | Dec 2020 to Dec 2024 |
Initial Operation Date | December 2020 |
Annual Generation | 3.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF21-709-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Baltimore Gas & Electric Co (1167) MD |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator 64606 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 4.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Burns Solar One LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3554 | Changeup | Asheboro, NC | 3.9 GWh |
#3555 | Calibrant Bakersfield LLC | Bakersfield, CA | 3.9 GWh |
#3556 | Columbia Substation | Appling, GA | 3.9 GWh |
#3557 | Adams Community Solar Garden LLC | Watkins, CO | 3.9 GWh |
#3558 | Adams Community Solar Garden III LLC | Watkins, CO | 3.9 GWh |
#3559 | NSE Camber Solar PS11 LLC (CSG) | Sterling, CO | 3.9 GWh |
#3560 | North Kern 1 | Shafter, CA | 3.9 GWh |
#3561 | Pivot Solar 2 LLC (CSG) | Brush, CO | 3.9 GWh |
#3562 | Mill Creek Solar (OR) | Sheridan, OR | 3.9 GWh |
#3563 | South Sioux City Solar | Dakota, NE | 3.9 GWh |
#3565 | Valencia 2 | Imperial, CA | 3.9 GWh |
#3566 | Mission Solar LLC | Merced, CA | 3.8 GWh |
#3567 | Ware Avra II | Waycross, GA | 3.8 GWh |
#3568 | MD - CS - Potomac Edison Co - GA29 TPE | Friendsville, MD | 3.8 GWh |
#3569 | Polk Cedartown 2 | Cedartown, GA | 3.8 GWh |
#3570 | Briarwood | Greenwood, SC | 3.8 GWh |
#3571 | Aerojet II | Rancho Cordova, CA | 3.8 GWh |
#3572 | Ridgeback | Liberty, NC | 3.8 GWh |
#3573 | Estrella Mountain PV | Avondale, AZ | 3.8 GWh |
#3574 | Washington County | West Bend, WI | 3.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Burns Solar One LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alpha Ridge LFG | Marriottsville, MD | 258.0 MWh | 12.1 mi |
Bomber CSG | Hampstead, MD | 9.2 GWh | 8.5 mi |
CCBC-Catonsville | Catonsville, MD | 2.5 GWh | 16.7 mi |
Chimes West Friendship (Nixon Farms) | West Friendship, MD | 1.7 GWh | 13.6 mi |
FFP - MD Foxhall | Freeland, MD | 4.0 GWh | 15.6 mi |
Friendship I | West Friendship, MD | 4.4 GWh | 13.3 mi |
Friendship II | West Friendship, MD | 4.4 GWh | 13.3 mi |
KDC Solar CV Animal Control LLC | West Friendship, MD | 3.1 GWh | 13 mi |
KDC Solar CV Ascend One LLC | West Friendship, MD | 3.7 GWh | 13 mi |
KDC Solar CV Cedar Lane Park LLC | West Friendship, MD | 3.1 GWh | 13 mi |
KDC Solar CV Central MD Regional Transit | West Friendship, MD | 2.9 GWh | 13.2 mi |
KDC Solar CV O'Donnell Property LLC | West Friendship, MD | 3.0 GWh | 13.2 mi |
KDC Solar TC Blandair Park LLC | West Friendship, MD | 3.7 GWh | 13.4 mi |
KDC Solar TC George Howard LLC | West Friendship, MD | 3.4 GWh | 13.4 mi |
KDC Solar TC Little Patuxent WWTP LLC | West Friendship, MD | 3.8 GWh | 13.5 mi |
Lion One | Baltimore, MD | 2.5 GWh | 11 mi |
Old Court Rd Solar | Woodstock, MD | 2.9 GWh | 9.4 mi |
P52ES 1755 Henryton Rd Phase 1 LLC CSG | Marriottsville, MD | 3.4 GWh | 11.5 mi |
P52ES 1755 Henryton Rd Phase 2 LLC | Marriottsville, MD | 3.8 GWh | 11.5 mi |
Timonium Fairgrounds | Timonium, MD | 2.8 GWh | 12.1 mi |