Augusta Electric Plant No 1
621 Grove Street, Augusta, KS 67010Plant Summary Information
Augusta Electric Plant No 1 is ranked #47 out of 57 distillate fuel oil power plants in Kansas in terms of total annual net electricity generation.
Augusta Electric Plant No 1 is comprised of 8 generators and generated 1.3 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Augusta Electric Plant No 1 |
|---|---|
| Utility Name | City of Augusta - (KS) |
| Location | Butler County, KS |
| Initial Operation Date | August 1929 |
| Last Update | Dec 2025 |
| Annual Generation | 5.0 MWh |
| Annual Consumption | 140 MMBtu |
| Ranked #13,040 out of 13,081 Power Plants Nationwide | |
| Ranked #1,173 out of 1,233 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #171 out of 175 Kansas Power Plants | |
| Ranked #47 out of 57 Kansas Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of Augusta Electric Plant No 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Augusta Electric Plant No 1.
Monthly Net Generation for Augusta Electric Plant No 1
Monthly Plant Fuel Consumption for Augusta Electric Plant No 1
Augusta Electric Plant No 1 Details
| Summary Information | |
|---|---|
| Plant Name | Augusta Electric Plant No 1 (1261) |
| Plant Address | 621 Grove Street, Augusta, KS 67010 |
| Utility | City of Augusta - (KS) (998) |
| Latitude, Longitude | 37.67845, -96.97193 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | August 1929 |
| Annual Generation | 5.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Augusta - (KS) (998) KS |
| Grid Voltage | 4.16 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | KANSAS GAS SERVICE COMPANY |
| Natural Gas Storage | No |
Generator 2 Details Standby August 1929
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.2 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
|---|---|
| First Operation Date | August 1929 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 4 Details Standby August 1939
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.7 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.7 MW |
| Minimum Load | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
|---|---|
| First Operation Date | August 1939 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
Generator 3 Details Standby December 1949
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
| First Operation Date | December 1949 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
Generator 1 Details Standby July 1954
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.1 MW |
| Winter Capacity | 1.1 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
| First Operation Date | July 1954 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
Generator 5 Details Standby June 1956
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.2 MW |
| Winter Capacity | 2.2 MW |
| Minimum Load | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
| First Operation Date | June 1956 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
Generator 6 Details Standby July 1956
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.2 MW |
| Winter Capacity | 2.2 MW |
| Minimum Load | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
| First Operation Date | July 1956 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
Generator 7 Details Standby April 1964
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Minimum Load | 0.7 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
| First Operation Date | April 1964 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
Generator 8 Details Standby August 2016
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
| First Operation Date | August 2016 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Augusta Electric Plant No 1 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1163 | Emory Hillandale Hospital | Lithonia, GA | 6.0 MWh |
| #1164 | Catawba River Pollution Control | Morganton, NC | 6.0 MWh |
| #1165 | Fredonia (KS) | Fredonia, KS | 6.0 MWh |
| #1166 | Fordham University | Bronx, NY | 6.0 MWh |
| #1167 | La Plata | La Plata, MO | 5.9 MWh |
| #1168 | Ellinwood | Ellinwood, KS | 28.0 MWh |
| #1169 | Vicinity Energy Trenton, L.P. | Trenton, NJ | 174.0 MWh |
| #1170 | Hurricane City Power | Hurricane, UT | 7.0 GWh |
| #1171 | Elkton | Elkton, VA | 7.4 GWh |
| #1172 | Lincoln | Lincoln, KS | 32.0 MWh |
| #1174 | Kahoka | Kahoka, MO | 5.0 MWh |
| #1175 | Washington Island | Washington Island, WI | 5.0 MWh |
| #1176 | Brooklyn Hospital Center | Brooklyn, NY | 5.0 MWh |
| #1177 | Erie | Erie, KS | 4.9 MWh |
| #1178 | Bucknell University | Lewisburg, PA | 43.6 GWh |
| #1179 | Regional Wastewater Control Facility | Stockton, CA | 4.0 GWh |
| #1180 | Stony Brook Cogen Plant | Stony Brook, NY | 284.6 GWh |
| #1181 | MPEA Energy Center | Chicago, IL | 4.0 MWh |
| #1182 | Dike City Power Plant | Dike, IA | 4.0 MWh |
| #1183 | West Diesel Generation Unit | Pocahontas, IA | 4.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Augusta Electric Plant No 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Augusta Electric Plant No 2 | Augusta, KS | 832.0 MWh | 0.6 mi |
| Caney River Wind Project | Howard, KS | 593.7 GWh | 33.8 mi |
| Cheney Solar | Cheney, KS | 2.3 GWh | 40.9 mi |
| DeGraff Butler Electric | Burns, KS | 2.1 GWh | 22 mi |
| East 12th Street | Winfield, KS | 10.5 GWh | 30.5 mi |
| El Dorado Refinery | El Dorado, KS | 231.6 GWh | 9.4 mi |
| Elk River Wind | Beaumont, KS | 264.8 GWh | 24.1 mi |
| Gordon Evans Energy Center | Colwich, KS | 313.7 GWh | 31 mi |
| Harvey County | Newton, KS | 2.3 GWh | 28.3 mi |
| Maize | Colwich, KS | 2.3 GWh | 29.9 mi |
| Mulvane 2 | Mulvane, KS | 61.0 MWh | 18.8 mi |
| Oxford (KS) | Oxford, KS | 4.0 MWh | 29.7 mi |
| Prairie Sky Solar Farm | Andover, KS | 1.9 GWh | 7.6 mi |
| Slate Creek Wind Project LLC | Geuda Springs, KS | 444.7 GWh | 41.6 mi |
| Sunflower Energy Center, LLC | Peabody, KS | 798.8 GWh | 38.4 mi |
| Waste Water Plant Generator | Winfield, KS | 6.0 MWh | 31.2 mi |
| Wellington 1 | Wellington, KS | 6.1 GWh | 37.4 mi |
| Wellington 2 | Wellington, KS | 3.1 GWh | 35.1 mi |
| West 14th Street | Winfield, KS | 2.4 GWh | 30.7 mi |
| WPWP | Wellington, KS | 1.1 TWh | 30.3 mi |